Laserfiche WebLink
It= owtwtxs <br /> � & rRVEYM% W. <br /> vg <br /> SANITARY SEWER SEPTIC DESIGN <br /> Project: Great Pacific Nut, 3501 W. Lehman Road, Tracy, CA <br /> Building Size: 30,000 Proposed Warehouse Building <br /> No. of Employees: 12 <br /> No. of Bathrooms: 2 Employee Only <br /> Fixture Count: <br /> Kind of Fixture <br /> Water Closets (Toilet) 3 <br /> Septic Tank Capacity for 3 Toilet Fixtures = 1200 Gal. <br /> Total Fixtures = 3 <br /> Per Table 6.6 Water Use Computation Table For "R. Industrial Building no food cafeteria" <br /> 15 Gal/Person/Day <br /> ADF = 12 x 15 = 180 Gal. <br /> BTC = 1200 Gal. <br /> Min. Tank Size = BTC + ADF = 1200 + 180 = 1380 Gal. <br /> Use 1500 Gallon Tank <br /> Leach Field <br /> Type of Soil: Dark Brown Plastic Clay (From CTE Percolation Testing at Septic Leach Area) <br /> Soil Factor = 0.250 Clay per Table 9.7.2 Soil Factors <br /> Leach Line = 1380 x 0.25 = 345 Ft. <br /> Filter Bed = Leach Line x 4 = 1380 Sq.Ft. <br /> QROFESS!% <br /> Use 4 Leach Lines x 90 Ft. OR D.°A-.o Fyc <br /> Use 20 Ft. x 70 Ft. = 1400 Sq.Ft. Filter Bed <br /> (Provide Area for 100% Future Back-up) •,EXP.12C/31-20e°e g <br /> CIVIV- <br /> qTf OF CIL If e <br /> Qppo <br /> 5/3/2019 Page 1 of 1 Job No. 18-166 <br />