My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084318
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1904
>
2900 - Site Mitigation Program
>
SR0084318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2022 10:58:16 AM
Creation date
10/4/2022 10:03:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084318
PE
2903
FACILITY_ID
FA0024809
FACILITY_NAME
OXYCHEM STOCKTON
STREET_NUMBER
1904
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16302041
ENTERED_DATE
10/7/2021 12:00:00 AM
SITE_LOCATION
1904 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consWtants <br /> 4.6.3 Groundwater Samples <br /> Groundwater samples from monitoring wells MW-5B and MW-7B will be collected for analysis <br /> of the following: <br /> • 1,2,3-TCP by United States Environmental Protection Agency (USEPA) Method 8260 <br /> in selected ion monitoring mode; <br /> • 1,2-DCP and chloroform by USEPA Method 8260B; and <br /> • DBCP by USEPA Method 504.1. <br /> The following quality assurance/quality control samples will be collected: <br /> • A duplicate groundwater sample will be collected and analyzed for 1,2-DCP, 1,2,3- <br /> TCP, DBCP and chloroform by the respective USEPA Methods referenced above; and <br /> • Two laboratory-provided trip blanks pre-filled by the laboratory with deionized water <br /> that will accompany the sample containers during transport, prior to, during, and after <br /> sampling, will be analyzed for VOCs by USEPA Method 8260B. <br /> 4.7 Investigation-Derived Waste <br /> Soil cuttings and any other investigation-derived waste (IDW) will be temporarily stored in 55- <br /> gallon drums at the Site. The IDW will be profiled and disposed of at an appropriate off-Site <br /> facility. <br /> Work Plan for Vapor Intrusion Investigation 10 July 30,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.