Laserfiche WebLink
❑Dam release,flash flood,tide I Geosyntec Procedure(s):HS-306-Working on/near Water and Ice, <br /> ❑ Diving HS-312-Water Transportation Safety <br /> ❑ Ice on/near water body <br /> 13.4. FALL HAZARDS ❑ Applicable ® Not Applicable,Not Anticipated <br /> EXPLANATORY NOTES,CLARIFICATIONS: <br /> WORKING AT HEIGHTS(GENERAL) General fall protection requirement thresholds:required @>4'(industry),>6'(construction),>10'(scaffolds) <br /> Hazards:Falls,overhead hazards, ❑ Ensure guardrails present ❑Restrict access beneath work to protect other <br /> impalement hazard(such as from ❑Use personal fall apparatus(PFA) site personnel from overhead hazards <br /> falling onto unprotected rebar and ( ❑Use tether or positioning device ❑ Ensure safe access to elevated work location <br /> similar) ❑Restrict access to hazard(barriers,tape,sign) (ladder,stair,) <br /> ❑Ensure covers in place over holes ❑ Install caps on protruding rebar <br /> ❑Use designated"watch person" <br /> ❑Use fall protection net <br /> Geosyntec Procedure(s):HS-120-Fall Protection,HS-210-Walking and Working Surfaces <br /> ❑ LADDERS/STAIRS ❑Follow safe work practices: <br /> ❑ Extension/straight ladders • Use ladders according to safe practices and manufacturer's instructions. <br /> ❑ Step ladders • Maintain 3 points of contact at all times on ladder;keep center of gravity within side rails. <br /> ❑ Fixed ladders • Do not use metal(conductive)ladder near electrical hazard. <br /> ❑ Stairs • Extension/straight ladders shall be properly footed,secured,angled,extend above upper work surface. <br /> Hazards: Falls,overhead hazards I <br /> • Stepladders are set on level ground or properly shimmed,spreaders locked;do not climb/stand on top <br /> step,top cap,or rear non-climbing side;use step ladder of sufficient length for work. <br /> • Equip stairs with stair-rails where more than 4 steps,and for stairway height 4'or more. <br /> Geosyntec Procedure(s):HS-501-Ladders <br /> SCAFFOLD j ❑Follow safe work practices: <br /> El Supported scaffold • Identify/coordinate operations with subcontractor's competent person. <br /> ❑Suspended scaffold • Supported scaffold level,stable,proper attachments,tiebacks,planking, <br /> ❑Free-standing/mobile scaffold • Suspended scaffolds anchored properly. <br /> I Hazards:Falls,overhead hazards, 1 • Guardrails or personal fall apparatus required above 10 feet. <br /> equipment collapse. • Proper means of accessing scaffold(proper ladders,stair tower), <br /> • Total height of free-standing scaffold not to exceed four times the minimum base dimension. <br /> • Do not exceed load limits;store/stage materials in quantities sufficient for immediate use. <br /> Geosyntec Procedure(s):HS-507-Scaffolds <br /> EJ AERIAL LIFT ❑ Follow safe work practices: <br /> Hazards:Falls,overhead hazards, 1 • Operators to be sufficiently trained,experienced and qualified, <br /> struck-by,run-over,caught between i • Equipment is inspected after mobilization and is in good condition. <br /> (pinch points),tip over,fluid leaks. i • Harness&lanyard worn whenever operating the lift(possible exception for scissor lifts). <br /> • Overhead and surface obstructions to be reviewed with operators prior to use. <br /> Geosyntec Procedure(s):HS-509-Aerial Lifts <br /> ❑ j IMPORTANT! This work may/will I ❑Follow safe work practices per Section B.9.,"Utility Related Hazards' <br /> include close proximity to overhead <br /> electric utility lines. <br /> 13.5. POWERED TOOLS,EQUIPMENT,MACHINERY ® Applicable ❑ Not Applicable,Not Anticipated <br /> EXPLANATORY NOTES,CLARIFICATIONS: Electrically powered equipment may be used during this project,including fans for use as engineering controls. Gasoline <br /> powered generators will be used to power this equipment. <br /> ® POWERED HAND TOOLS ® For all power tools: <br /> ® Battery-operated • Inspect tools to ensure safe operating condition before each use. <br /> ®Electric-powered,120v/240v • Use tool in accordance with manufacturer's specifications. <br /> ® Fuel-powered • Ensure guards are in place and no hazardous equipment modifications. <br /> ❑ Pneumatic <br /> • Use PPE or other safety practices,as appropriate,for eye/hearing/hand/head/body protection. <br /> I <br /> El Powder-actuated • Provide training or verify operator competency for use of power tool. <br /> i � <br /> • Stay clear of hazard zone,"line of fire,"when working near where power tools are used. <br /> i • For spark/heat generating tool,control fire hazards,segregate combustible/flammable materials. <br /> Hazards:Eye/hand/body injury,fuel- I • Use vise/clam /work bench or other <br /> related hazards,Inhalation hazards, I p appropriate means to hold/secure the work piece. <br /> noise,sparks,heat,fire hazard, ❑ Use respirators,ventilation,wet methods,other appropriate means to control inhalation hazard. <br /> electrical hazards ®See fuel-safety practices in Section B.13.,"Commercial Chemical Products." <br /> ® For electrical hazards,see Section B.B.,"Electrical Hazards". <br /> Geosyntec Procedure(s):HS-109-Hearing Conservation,HS-113-Personal Protective Equipment <br /> HS-121-Electrical Safety,HS-503-Powered Hand Tools,Others as applicable <br /> Geosyntec° THA—Drilling/Development Operations Safety 1/29/2019 <br /> GSH Stockton Phyto,TR0712C Page 6 <br /> consultants <br />