My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085267
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARBOR
>
9409
>
4200 – Liquid Waste Program
>
SR0085267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2022 11:04:33 AM
Creation date
10/6/2022 10:27:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
RECORD_ID
SR0085267
PE
2602
STREET_NUMBER
9409
Direction
W
STREET_NAME
ARBOR
STREET_TYPE
AVE
City
TRACY
Zip
95304
APN
21216020
ENTERED_DATE
5/12/2022 12:00:00 AM
SITE_LOCATION
9409 W ARBOR AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phelan Development Holly Master Plan - Buildings H & 1 <br /> 15188.000.006 Geotechnical Exploration <br /> TABLE OF CONTENTS (Continued) <br /> 5.7.2.1 General............................................................................................. 15 <br /> 5.7.2.2 Structural Areas................................................................................ 15 <br /> 5.8 SITE DRAINAGE.......................................................................................................... 16 <br /> 5.8.1 Surface Drainage............................................................................................. 16 <br /> 6.0 FOUNDATION RECOMMENDATIONS ............................................................. 16 <br /> 6.1 GROUND IMPROVEMENT.......................................................................................... 16 <br /> 6.2 CONVENTIONAL FOOTINGS WITH SLAB-ON-GRADE .............................................. 16 <br /> 6.2.1 Footing Dimensions and Allowable Bearing Capacity....................................... 16 <br /> 6.2.2 Reinforcement ................................................................................................. 17 <br /> 6.2.3 Foundation Lateral Resistance......................................................................... 17 <br /> 6.2.4 Settlement ....................................................................................................... 17 <br /> 7.0 SLABS-ON-GRADE........................................................................................... 18 <br /> 7.1 INTERIOR CONCRETE FLOOR SLABS ...................................................................... 18 <br /> 7.1.1 Lime-Treated Subgrade ................................................................................... 18 <br /> 7.1.2 Slab Thickness................................................................................................. 18 <br /> 7.1.3 Slab Moisture Vapor Reduction........................................................................ 19 <br /> 7.2 EXTERIOR FLATWORK............................................................................................... 19 <br /> 7.3 TRENCH BACKFILL..................................................................................................... 19 <br /> 8.0 RETAINING WALLS .......................................................................................... 19 <br /> 8.1 LATERAL SOIL PRESSURES...................................................................................... 19 <br /> 8.2 RETAINING WALL DRAINAGE....................................................................................20 <br /> 8.3 BACKFILL....................................................................................................................20 <br /> 8.4 FOUNDATIONS ...........................................................................................................21 <br /> 9.0 PAVEMENT DESIGN ......................................................................................... 21 <br /> 9.1 FLEXIBLE PAVEMENTS..............................................................................................21 <br /> 9.2 RIGID PAVEMENTS.....................................................................................................21 <br /> 9.3 SUBGRADE AND AGGREGATE BASE COMPACTION...............................................22 <br /> 9.4 CUT-OFF CURBS........................................................................................................22 <br /> 10.0 LIMITATIONS AND UNIFORMITY OF CONDITIONS ....................................... 22 <br /> SELECTED REFERENCES <br /> FIGURES <br /> APPENDIX A— Exploration Logs <br /> APPENDIX B — Laboratory Test Data <br /> APPENDIX C — CPT Data <br /> APPENDIX D — Liquefaction Analysis <br /> ENGEOii of ii December 13, 2021 <br /> Expect Excellence— <br />
The URL can be used to link to this page
Your browser does not support the video tag.