Laserfiche WebLink
May 20, 1982 <br /> Project 116-1 .4 <br /> ?. Clay cups on top of completed Group l disposal trc-nchcs have been <br /> graded and all ponded water has been removed, i,dditional fill <br /> wi 1 i be placed to establish effective drainage .grades prior <br /> to the onset of next winter' s rainy season. <br /> 8. Storage and movement of heavy equipment on the clay caps over <br /> the completed Group 1 Trenches will by discontinued. Tha- <br /> existing equipment in storage is in the process of boing moved <br /> and access roads are being rerouted. We anticipate this work <br /> will be completed by July la, 1982. <br /> 9. Leachate which accumulates in the collection sumps of the <br /> Group 1 Trenches will , in every case, be sampled and analyzed <br /> in accordance with specifications developed by your staff. <br /> We have already implemented this procedure and have submitted <br /> analysis" of waste materials transferred with our monitoring <br /> report dated Ppril 12, 1982, This procedure will be continued <br /> in all cases involving future transfer of waste. <br /> 10. Vie have discussed at length the jsl acer.e.it of our new neon i toil ng _ i <br /> wells, their design and their intondeed function with geologists <br /> of your staff and the State Water Resources Control Board. We <br /> have scheduled meetings with thcsc individuals ,-cr the oo.;ck of <br /> May 31 , to mance final plans for modification c.i thca existing <br /> innitoring well systein and the snmpl in : and nf'slvtic l procedures <br /> to be We have tentat-ivVy sc.hc�iul ud a drill rig to <br /> implement monitoring well construction for the week of June 7, 1982. <br /> 11 . Leachate: collection drains and scamps construCtecl in the trench <br /> liners wi i l boa redesigned to satisfy cciicrrnt, of yc:ur staff <br /> before additional Group 1 Tre„chs are placed in service. <br /> We have received a copy of the Interim Discharge Specifications for the <br /> Forward facility from your Board. Our evaluation of these specifications <br /> Indicates that , in their present form, they are not acceptable. tde have <br /> contacted members of the State Office of Appropriate Technralogy and the <br /> State Water Resources Control Board and indicated that we intend to revise <br /> our operations plan in accordance with the recer:tly adopted State policy <br /> of Alternative Waste Treatment and Recovery. We are moving ahead with these <br /> plans as rapidly as possible and have scheduled a pre-application meeting <br /> with appropriate State regulatory personnel for the ::ogee of June: 14 , 1982. <br /> Based upon the results of that meeting, we will con',!oenc,e working with <br /> members of your staff on revisions to our Site Operations Plan. <br /> The comments to our existing operations plan received from staff members k <br /> of the various agencies has resulted in preparation of <a report of responses. <br /> This document will be submitted to your BDard during Junz>, 1982. As indi- <br /> cated above, however, cur revised operations pian w i i I un.iDu1)tedIy resent <br /> in additional comments which must be prepared and submitted at a later date. <br />