My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1982-1983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1982-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:38 PM
Creation date
10/6/2022 3:15:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1982-1983
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> May 20, 15J2. <br /> Project 116-1 .4 <br /> 2 _ <br /> 2. The liners under the solar evaporation ponds were discuss>cd at <br /> our recent meeting and hopefully , any rrevious misundcrstzindings <br /> were clarified.- We agreed to add on : additional foot of li"e°r- <br /> in Pond #5 alone the construction joint suparating Fond f'5 from <br /> Ponds #1 through #4. This corrective work cannot bre complexted <br /> however until we have cle�nneed evaporazio�n Fond -`1 and po:;sit�ly <br /> Pond n2. We estimate this cleaning activity will be c(I-l-,picted <br /> by August 1 , 1952. In the interim period , we request perrr.ission <br /> to resume use of Pond #5 until the clearsing o?eration cd�;n be <br /> brought to completion. At that time, Pond #5 will b =. euimw,, d <br /> free of any existing fluids. fine pond bottcom will be dried <br /> and the requested liner idditions will be placed. <br /> 3. The transfer of waste placed in Trench �;3 which caused an <br /> 112S gas reaction uses discontinued as croon as the p r•ob i em was <br /> noted. We intend to place the dri l l in,; muds fro-lira Ponds ;'1 and #2 <br /> In Trench #3; however, this *, ante transfer will not take Place <br /> until the d ri i l i ng muds have been dr i uG. If thn ranaad is raat <br /> accompanied by sub!c tant i a l qui-i at i t i es of water, tlic: I125 gas r"e- <br /> action will not recur. In :adiltion, bQ�Orc: any a.aste transfer <br /> takes place :re will do the. ra; cessar-y ch;wrr�i:al .a+aLalysis to establish <br /> that the waste transfer does not invol,,,e irice�?i1JtiEale rr'.nterials. <br /> y <br /> 74. Sieewall liners in Group 1 disposal trenciae?s , in our opinion, <br /> do not rFaturially protect against I-Itc'raaf Iliclr'i�tiC;r?. If thy' <br /> trenches are constructed in accordance"' with ti-.c operations <br /> Plan, the only material doti•,fngradient from any of t a ur°c.,up 1 <br /> Trenches will be another Group 1 Trench cor-taining 5 imi la:- types <br /> of waste. If liners are to be effective, they should be placed <br /> on the west wall of the final trench constructed in thi•°s series. <br /> We request that you consider these facts and the information <br /> submitted with our operations plan before requiring the use of <br /> sidewall liners in the disposal trenches. We will await your <br /> decision on this issue, prior to completion of Group 1 Trench {4 . <br /> 5. As discussed above, recently completed evaporation Pond #5 currently <br /> contains drilling mud waste. We feel that the correction developed <br /> with your staff will resolve the problem with the Pond #5 'liner. <br /> We will make every effort to complete the correction required <br /> in the time interval requested , ho°.ae:ver, it will be necessary to <br /> resume use of Pond #5 until cleaning activity can be completed. <br /> Again, we request your approval to resume use of "und ;.5 sit-ice <br /> the existing liner was placed and compacted to recommended State <br /> specification and permeability values were obtained a full order <br /> of magnitude lower than Class II-I requirements. <br /> 6. Freeboard in Ponds #1 , #4 and #5 has bc,en established by placement <br /> of additional compacted fill material . All contairn;,ae�nt embank <br /> ments are in place and the. required Ievej s of freeboard have <br /> been established at the date of this writing. <br /> 'Beta CA ssoci ales <br /> v`we✓ <br />
The URL can be used to link to this page
Your browser does not support the video tag.