Laserfiche WebLink
Forward, L­,c, 23 April 1982 <br /> [This allows staff to review major discharges before they occur.] <br /> 2® A waste material for which new monitoring would be required . <br /> [This refers back to specification II .E® It allots staff to be <br /> alerted to and to review new hazardous constituent discharges at <br /> the site before they occur. Staff .is then aware that new consti- <br /> tuents should appear in the following monitoring reports.] <br /> IV. The above specifications will expire upon adoption of revised Waste <br /> Discharge Requirements® <br /> [Staff is currently working on UDdatled requilrements for `Lhe Forward site. <br /> After these specifications have been reviewed by other agencies and tested <br /> t-he <br /> a5 to their war lbability by the site operator, they will he inclulded i n <br /> revised requirem;,�nts. Since they aiay need revision, these interim sp(,,ci- <br /> fications will then eXpire®] <br /> V., These specifications may be nodi fird only upon written approval of the <br /> Executive Officer® <br /> [This provides the means by which problems with the specifications may be <br /> corrected during the interim period . After discharge specifications have <br /> been added to new Waste Discharge Requirements, inodifications will require <br /> Board approval <br />