Laserfiche WebLink
e <br /> 1 horizontal pond bottom and the sloping side, and <br /> 2 one other sample site may be located on the sloping <br /> 3 south side of theand <br /> , at the juncture of the <br /> 4 horizontal pond bottom and the sloping side. <br /> 5 6) Up to four ( ) sites should be located on the pond <br /> 6 bottom proper, spaced as follows® <br /> 7 a) One near the center of the pond. <br /> 8 b) One midway between the center of the pond and <br /> 9 the West end of the pond. <br /> 10 c) One midway between the center of the pond and <br /> 11 that East end of the pond, and <br /> 12 d) At the East end of the pond. <br /> 13 7) Each site will be sampled at two foot (21 ) <br /> 14 intervals to a depth of ten feet (11 ) below the <br /> 15 top of the pond "liner" . <br /> 16 ) All of the soil taken from the hole should be put <br /> 17 into the sample container, a plastic bag, from, <br /> 18 say, the surface to the depth of two feet (21 ) . <br /> 19 ) All of the soil taken from the hole from the depth <br /> 20 of two feet ( ° ) to the depth of four feet (4' ) <br /> 21 should be put into a second plastic bag, and so o . <br /> 22 1 ) Each container should be carefully labelled. <br /> 23 11) In this way, five samples may be collected at each <br /> 24 site, and there may be six sampling sites in each <br /> 25 pond. That will produce up to 30 samples for each <br /> 26 <br /> pond. <br /> 27 1 ) A "full auger" as previously suggested by Robert <br /> 2 (Fete) Clark of All Terrain Drilling Company will <br />