My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1982-1983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1982-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:38 PM
Creation date
10/6/2022 3:15:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1982-1983
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A ` <br /> 1 The parties, at their own expense, may then test for some <br /> 2 or all of the constituents listed on page 3 above. <br /> 3 4. Forward, Inc. will not allow any material to be <br /> 4 placed in ponds 1, 2 or 3, until the samples are taken and for <br /> 5 24 hours after samples are delivered to the parties listed in <br /> the preceding paragraph® <br /> 7 5. Plugging the drill holes will be done by filling to <br /> within one foot (1 ° ) of surface with one--eighth inch (1/8") to <br /> one-quarter inch ( 1./4") pea gravel , then introducing a slurry <br /> 10 mixture consisting of eighty-five percent (35%) bentonite clay <br /> 11 and fifteen percent (15 ) cement ; then leaving open for twenty- <br /> 12 <br /> ty-12 four (24) hours to allow for settlement, then filling to original <br /> 13 grade with clay, a sample of which has been tested for compaction <br /> 14 to a density which provides a minimum permeability of 1 x 1 - <br /> 15 centimeters per second. San Joaquin Farm Bureau Federation shal ` <br /> 16 pay the cost thereof. Holes shall be plugged as soon as possible , <br /> 17 but within one week of final drilling. The plugging of ,the hole: <br /> 18 may be performed by Dwight Baier. <br /> 19 6 . San Joaquin Farm Bureau Federation will pay the driller <br /> 4 <br /> 20 <br /> for costs of his preparation for and performance of the drilling, <br /> 1 will pay Brown and Caldwell (sample divider) the cost of procssi. ' <br /> 22 and dividing the samples , and will pay for the cost of plugging <br /> 23 drill holes in the manner and to the standards specified in the <br /> 24 immediately preceding paragraph® <br /> 25 7. The hearing in the above entitled matter, concerning <br /> 26 issuance of Order to Show Cause and Temporary Restraining Order, <br /> 27 scheduled for June 28, 1982 , at 10 :00 a.m. in Department No® 7, <br /> 28 is dropped from calendar until further notice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.