My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1982-1983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1982-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:38 PM
Creation date
10/6/2022 3:15:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1982-1983
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 4 <br /> MODIFIED TIME SCHEDULE FOR FORWARD, INC. <br /> Compliance <br /> Task Specific Action per Order Date <br /> 1 . Installation of monitoring wells numbered 10, 11 , <br /> 13, 14, and 16 as specified in the revised Moni- <br /> toring and Reporting Program No. 73-183. <br /> Commence construction 2 May 1983 <br /> Construction time 10 days <br /> Finish construction 13 May 1983 <br /> Submittal of compliance report 15 Jun 1983 <br /> 2. Construction of disposal Trench No. 4 in a manner <br /> which will prevent the escape of approved Group 1 <br /> wastes or waste constituents from containment <br /> facilities and which will comply, where appropriate, <br /> with the federal Resource Conservation and <br /> Recovery Act. <br /> Commence construction 16 May 1983 <br /> Construction time 12 days <br /> Finish construction 31 May 1983 <br /> Submittal of compliance report 15 Jun 1983 <br /> 3. Elimination and excavation of solar evaporation ponds <br /> numbered 1 , -2, 3, 4, and 5 in a manner which will <br /> comply with appropriate requirements for <br /> closure. <br /> Commence construction 10 August 1983. <br /> Construction time 15 des <br /> Finish construction 31 August 1983 <br /> Submittal of compliance report 15 Sep 1983 <br /> 4. Regrading and- completion of final cover (caps) for <br /> Group 1 disposal trenches numbered 1 , 2, and 3 to <br /> prevent infiltration and ponding of surface water. <br />