My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1982-1983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1982-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:38 PM
Creation date
10/6/2022 3:15:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1982-1983
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 4 <br /> Compliance . <br /> Task Specific Action per Order Date <br /> 5. Relocation of access roads to preclude transport <br /> over caps covering the Group 1 disposal trenches. <br /> 7. Control of surface drainage to prevent ponding, <br /> contact with waste materials, and overflow of <br /> containment structures. <br /> 8. Regrading of cover on Group 2 disposal area to <br /> prevent ponding of surface water. <br /> Commence construction 13 June 1983 <br /> Construction time l0 days <br /> Finish construction 24 June 1983 <br /> Submittal of compliance report 15 Jul 1983. <br /> 6. Relocation and proper disposal of drilling mud <br /> wastes and wastes received from FMC, Modesto <br /> that are improperly located on caps covering <br /> Group 1 disposal trenches and Group 2 waste <br /> areas. <br /> Commence construction 30 May 1983 <br /> Construction time 10 days <br /> Finish construction 10 June 1983 <br /> Submittal of compliance report 15 Jul 1983 <br />
The URL can be used to link to this page
Your browser does not support the video tag.