e <br /> t <br /> MR. BOB FUJII <br /> May 2 , 1983 <br /> Page Four <br /> . at the same time work on the surface drainage <br /> system is being completed. We have already <br /> spent approximately one week between rainstorms <br /> working in the Group II disposal area in an <br /> effort to eliminate ponding and establish some <br /> surface drainage. The surface runoff from this <br /> area has been conducted through a series of ditches <br /> and underdrains into the evaporation pond system <br /> and there has been no escape of contaminated <br /> water from the site. This was established at <br /> the request of your staff and has been inspected <br /> on numerous occasions by representatives from all <br /> concerned regulatory agencies. <br /> It. was our intention to schedule work on the above <br /> items in early April, 1983 and we intended to complete work <br /> on all possible projects prior to the upcoming hearing of <br /> your Board in Stockton on May 27. Weather conditions <br /> however, have not permitted mobilization of the necessary <br /> equipment and. we now expect that all work in Items #1 <br /> through #8 above will be completed by August 31, 1983. <br /> Ve y truly your , <br /> JOHN W. STOVALL <br /> for <br /> NEUMILLER & BEARDSLEE <br /> - A PROFESSIONAL CORPORATION <br /> JWS/djk <br /> c <br /> r rn <br /> rn <br />