Laserfiche WebLink
intermittently during and after filling to settle the filter pack prior to placement of the transition <br /> seal. <br /> The CONTRACTOR shall install a minimum of two (2) feet of bentonite transition seal above the <br /> sand filter pack via tremie pipe or equivalent. The bentonite seal shall be hydrated in <br /> accordance with manufacturer's specifications. <br /> The CONTRACTOR shall install a neat cement grout annular seal from the top of the bentonite <br /> seal to the bottom of the vault box depth. Neat cement grout shall be mixed at a ratio one 94- <br /> pound sack of Portland cement to 5-10 gallons of water. <br /> The CONTRACTOR shall install a locking pressure cap situated within a monument style <br /> (above-ground) well vault or flush mounted traffic-rated well vault, depending upon well location <br /> and site-specific requirements. The well vault shall be set in a 4-inch thick, two-foot by two-foot <br /> concrete pad, slightly above ground surface (if not set in an existing paved area). <br /> The CONTRACTOR shall place all drilling waste into CONTRACTOR-provided and labeled <br /> Department of Transportation (DOT)-approved 55-gallon steel drums to be hauled offsite and <br /> disposed by CONTRACTOR. <br /> The CONTRACTOR shall develop all monitoring wells for a minimum of 48 hours following the <br /> placement of the neat cement seal. CONTRACTOR will supply and calibrate daily a meter <br /> capable of measuring pH, temperature, conductivity, and turbidity. The CONTRACTOR will bail <br /> the wells to remove any sand and silt from the well casing. Following bailing, the well screen will <br /> be surged. After surging, the well will be pumped at least seven (7) well casing volumes and <br /> the field water quality parameters have stabilized. CONTRACTOR will place all purge water into <br /> DOT-approved 55-gallon steel drums to be hauled offsite and disposed by CONTRACTOR. <br /> Kleinfelder will collect samples and procure laboratory services to profile drill cuttings and purge <br /> water for CONTRACTOR disposal. <br /> 20191132.001A/SAC22P142176 Page 4 of 5 July 1, 2022 <br /> ©2022 Kleinfelder <br />