Laserfiche WebLink
3 BID SCHEDULE <br /> CONTRACTOR shall provide unit costs in the table below for completing up to seven (7) <br /> monitoring wells as outlined above. Invoices will be paid based on the actual quantity logged <br /> during well construction. Client reserves the right to stop work on advancement and installation <br /> of well activities at any time during the project. <br /> Unit <br /> Item Section Description of Services Cost Units Qty. Total <br /> 1 2.1 Prepare Permit Package Each 7 <br /> 2 2.1 Boring Mark-out Each 7 <br /> 4 2.2 Mob/De-mob/Dail Travel - Drill Rig Day 7 <br /> 5 2.2 Hand Auger Top Five 5 Feet Foot 35 <br /> 6 2.2 Hollow Stem Auger Services Foot 350 <br /> 7 2.2 Prevailing wage surcharge Hour 140 <br /> 8 2.3 Materials to install two-inch PVC well Foot 350 <br /> 9 2.3 Materials to install well box/monument Each 7 <br /> 10 2.3 Drums for soil cuttings and purge water Each 35 <br /> 11 2.3 Well Development Day 7 <br /> 12 2.3 Non-hazardous Soil & Water Disposal Each 7 <br /> 14 All Standby Time Hour 7 <br /> 15 All Estimated sales tax <br /> 16 All Total Project Costs <br /> Note: Costs above to be based on seven (7) working days for drilling /well installation and <br /> seven (7) working days for well development. Working hours shall be in accordance with <br /> applicable County ordinances. <br /> 20191132.001A/SAC22P142176 Page 5 of 5 July 1, 2022 <br /> ©2022 Kleinfelder <br />