Pacific Gas and <br /> Electric Company <br /> 8 . Streets and Roads : Access to facilities must be maintained at all times . Street lights may be <br /> allowed in the fee strip ( s ) and /or easement ( s ) but in all cases must be reviewed by PG & E for <br /> proper clearance . Roads and utilities should cross the transmission easement as nearly at right <br /> angles as possible . Road intersections will not be allowed within the transmission easement . <br /> 9 . Pipelines : Pipelines may be allowed provided crossings are held to a minimum and to be as <br /> nearly perpendicular as possible . Pipelines within 25 feet of PG & E structures require review by <br /> PG & E . Sprinklers systems may be allowed ; subject to review . Leach fields and septic tanks are <br /> not allowed . Construction plans must be submitted to PG & E for review and approval prior to the <br /> commencement of any construction . <br /> 10 . Signs : Signs are not allowed except in rare cases subject to individual review by PG & E . <br /> 11 . Recreation Areas : Playgrounds , parks , tennis courts , basketball courts , barbecue and light <br /> trucks ( pickups , vans , etc . ) may be allowed ; subject to review of plans . Heavy equipment <br /> access to PG & E facilities is to be maintained at all times . Parking is to clear PG & E structures by <br /> at least 10 feet . Protection of PG & E facilities from vehicular traffic is to be provided at <br /> developer' s expense AND to PG & E specifications . <br /> 12 . Construction Activity : Since construction activity will take place near PG & E ' s overhead <br /> electric lines , please be advised it is the contractor ' s responsibility to be aware of , and observe <br /> the minimum clearances for both workers and equipment operating near high voltage electric <br /> lines set out in the High -Voltage Electrical Safety Orders of the California Division of Industrial <br /> Safety ( I1ttps : // \vww . dH% ca . gov / ' I ' itle8 / sb5ti2 . litiiii ) , as well as any other safety regulations . <br /> Contractors shall comply with California Public Utilities Commission General Order 95 <br /> ( Ilttl) : //www . cpuc . ca . gov / dos /GO95 / go 95 startup page . html ) and all other safety rules . No <br /> construction may occur within 25 feet of PG & E ' s towers . All excavation activities may only <br /> commence after 811 protocols has been followed . <br /> Contractor shall ensure the protection of PG & E ' s towers and poles from vehicular damage by <br /> ( installing protective barriers ) Plans for protection barriers must be approved by PG & E prior to <br /> construction . <br /> 13 . PG & E is also the owner of distribution facilities throughout many of the areas within the <br /> state of California . Therefore , any plans that impact PG & E ' s facilities must be reviewed and <br /> approved by PG & E to ensure that no impact occurs that may endanger the safe and reliable <br /> operation of its facilities . <br /> PG & E Gas and Electric Facilities Page 6 <br /> Public <br />