My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1990-1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1990-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:13:34 PM
Creation date
10/17/2022 1:45:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1990-1993
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
788
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k4 KLEINFELDER <br />Following well installation, the new wells will be incorporated into the Post -Closure and <br />Subchapter 15 Monitoring Programs for Forward Landfill as follows: <br />Depth -to -water measurements will be made in each new well prior to sampling. <br />The measurements will then be converted to ground water elevations for each well <br />by subtracting them from the surveyed casing elevations. <br />When water levels in MW -1, MW -2A, MW -3, MW -5A, MW -12 and/or MW -13 fall <br />below a level practical for sampling, the new well that corresponds to the "dry" well <br />will be sampled in its place. For example, if MW -1 and MW -3 are found to be dry <br />while making depth -to -water measurements, MW -1B and MW -313 will be sampled <br />and analyzed as if they were MW -1 and MW -3, respectively. <br />Data Analysis and Report of Activities <br />Upon completion of the field activities described above, a report of activities will be <br />prepared for client review. The report will present a description of field activities and <br />observations. Subsequently, quarterly and annual reports required by RWQCB and DHS <br />will include contours of ground water elevation, tables of analytical data, and an assessment <br />of the ground water gradient and analytical results. <br />Project Schedule <br />The described scope of work will require approximately 5 weeks to complete. The <br />estimated duration of each task is as follows: <br />Well Installation 1 week <br />Developing 3 days <br />Surveying 1 day <br />Report of Activities 3 weeks <br />Limitations <br />Kleinfelder prepared this workplan in accordance with generally accepted standards of care <br />which exist in Northern California at this time. It should be recognized that definition and <br />evaluation of geologic and environmental conditions is a difficult and an inexact art. <br />Judgements leading to conclusions and recommendations are generally made with <br />incomplete knowledge of the subsurface conditions present. More extensive studies, <br />including subsurface investigations, may be performed to reduce uncertainties. If the client <br />wishes to reduce the uncertainties of this investigation, Kleinfelder should be notified for <br />additional consultation. No warranty, expressed or implied, is made. <br />F12-90-48 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.