Laserfiche WebLink
Geosyntec'' <br /> consultants <br /> • January 2019—Conduct field activities; and <br /> • April 2019—Submit report to RWQCB and DTSC. <br /> The project schedule may be adjusted in consultation with the RWQCB and DTSC based <br /> on potential delays due to property access,permitting, or subcontractor availability. <br /> 5. REFERENCES <br /> Central Valley Regional Water Quality Control Board (RWQCB), 2017. Review of <br /> Underground Storage Tank Sites: Rough and Ready Island, 2201 W. Washington <br /> Street, Stockton, San Joaquin County, California. September. <br /> RWQCB, 2018a. Review of UST Data Gap Investigation Work Plan, Rough and Ready <br /> Island, Port of Stockton, Stockton, San Joaquin County. February. <br /> RWQCB, 2018b. Central Valley Water Board Response to: Draft UST Data Gap <br /> Investigation Work Plan, Rough and Ready Island Port of Stockton, San Joaquin <br /> County, California. September. <br /> RWQCB, 2018c. Central Valley Water Board Response to: Draft Addendum to Draft <br /> UST Data Gap Investigation Work Plan, Rough and Ready Island Port of <br /> Stockton, San Joaquin County, California. December. <br /> Environmental Risk Services Corporation (ERS), 2008a. Draft Site UST 517 Closure <br /> Report, West Complex Rough and Ready Island, Port of Stockton, Stockton, <br /> California. January. <br /> ERS,2008b.UST 817B and UST 916B Site Characterization Report,West Complex Port <br /> of Stockton, Stockton, California. December. <br /> ERS,2009.UST 605 Draft Site Characterization Report,West Complex Port of Stockton, <br /> Stockton, California. September. <br /> Geosyntec Consultants,Inc.,2018.Draft Addendum to Draft UST Data Gap Investigation <br /> Work Plan, Rough and Ready Island Port of Stockton, San Joaquin County, <br /> California.November. <br /> 20190122- FINAL UST Data Gap Work Plan 15 22.01.2019 <br />