My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084222 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUMPHREYS
>
1200
>
2900 - Site Mitigation Program
>
SR0084222 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 11:53:00 AM
Creation date
10/18/2022 11:50:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084222
PE
2903
FACILITY_ID
FA0006725
FACILITY_NAME
NAVAL COMPUTER AND TELECOMMUNICATION STATION, FORMER (NCTS)
STREET_NUMBER
1200
STREET_NAME
HUMPHREYS
City
STOCKTON
Zip
95203
APN
16203007
ENTERED_DATE
9/16/2021 12:00:00 AM
SITE_LOCATION
1200 HUMPHREYS
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan, PFAS Site Inspection <br />Naval Computer and Telecommunications Station Stockton, California Introduction <br /> 1-2 DCN: TRBW-0202-5183-0010 <br />• Section 3: Technical Approach <br />• Section 4: Waste Management Plan <br />• Section 5: Reporting <br />• Section 6: Schedule <br />• Section 7: References <br />1.4 Project Management Organization <br />This project is administered by NAVFAC SW with Trevet-Bay West as the prime contractor. The <br />Navy is the lead agency with environmental regulatory oversight provided by the California EPA <br />Department of Toxic Substances Control (DTSC) and the Central Valley Regional Water Quality <br />Control Board (Water Board). Other stakeholders include the Port of Stockton, who acquired the <br />property from the Navy in 2003 and currently manages port and maritime activities at Rough and <br />Ready Island (RRI). Worksheet #5 of the SAP (Appendix A) provides a project organizational <br />chart, roles, and key personnel. Descriptions of the roles and lines of communication are provided <br />in Worksheets #6 and #7 of the SAP (Appendix A). <br />
The URL can be used to link to this page
Your browser does not support the video tag.