Laserfiche WebLink
<br />Geocon Project No. S2170-07-12 - 1 - June 6, 2022 <br />1.0 INTRODUCTION <br />This Health and Safety Plan (HSP) is a compilation of health and safety guidelines, policies and/or <br />performance protocols that, when exercised, are intended to reduce or eliminate the potential for injury <br />and exposure during the performance of the activities at the site described below. Conformance with its <br />contents does not warrant that injuries or exposures will not occur. <br /> <br />This HSP is not a training tool and does not contain the degree of detail necessary to train an employee <br />on the appropriate performance, approach and/or equipment-use protocols referenced, herein. Persons <br />working on this project and referring to this HSP shall meet the minimum training requirements <br />described in Section 2.2. <br /> <br />This HSP has been prepared to specifically support the field activities described herein. The provisions <br />described herein apply to employees of Geocon Consultants, Inc. (Geocon) and its subcontractors, <br />only. Representatives of the Client, Client-retained subcontractors, and representatives of state or local <br />government agencies are expected to observe the safety rules and requirements established by their <br />respective organizations, provided they do not conflict with this HSP. However, Geocon will not be <br />responsible for enforcing the conditions of this HSP on these representatives. <br /> <br />The contents of this HSP are based on factors and conditions understood prior to the start of the field <br />activities. If those factors and conditions change during performance of the activities or if conditions <br />exist that were not considered in the preparation of this HSP, then they shall be brought to the <br />immediate attention of the person approving this HSP, and the HSP shall be modified, accordingly. The <br />date indicated in Section 8.0 of this document indicates the latest version of this HSP. <br /> <br />All project personnel will review and become familiar with the elements of the Plan prior to site work. <br />A copy of the Plan will be provided to all subcontractors and the Project Manager, or designee <br />involved with project activities. <br /> <br />A pre-job conference will be held to delineate roles and responsibilities, discuss key elements of the <br />HSP, and coordinate activities. This HSP is a "working document" to be used by Geocon personnel. <br />The HSP may be modified at any time in accordance with Section 1.4 to adequately address <br />changing conditions or previously unrecognized exposure hazards which may be encountered during <br />the project. An updated, current copy of the HSP will be maintained at the project site and be <br />available to all affected personnel.