My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085020 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
311
>
2900 - Site Mitigation Program
>
SR0085020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 8:56:22 AM
Creation date
10/19/2022 8:38:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085020
PE
2903
FACILITY_ID
FA0027064
FACILITY_NAME
UNKNOWN PCE RIPON
STREET_NUMBER
311
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25907008
ENTERED_DATE
3/17/2022 12:00:00 AM
SITE_LOCATION
311 W MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 PRE-FIELD ACTIVITIES <br /> The following subsections discuss pre-fieldwork activities. <br /> 3.1 Property Access and Subcontractor Coordination <br /> Access agreements will be updated or established to allow for the performance of sampling activities(soil <br /> gas/indoor air/sub-slab)for the site investigation. <br /> Subcontractor quotes will be solicited for the proposed appropriate work task(s).As part of the solicitation <br /> process, prospective subcontractors will be evaluated to ensure their historical safety performance <br /> metrics meet or exceed APTIM's safety program requirements. <br /> 3.2 Field Mobilization/Demobilization <br /> Mobilization/demobilization and non-sampling activities include work scope planning, documentation <br /> preparation, site preparation, mobilization of equipment, materials and field personnel to the Site, and <br /> management of wastes. <br /> 3.2.1 Permitting and Notification <br /> At least two weeks before mobilization to the Site,the RWQCB will be notified of upcoming field activities. <br /> APTIM will obtain an encroachment permit from the City of Ripon Engineering Department and obtain <br /> boring permit(s)from the San Joaquin County Environmental Health Department(SJCEHD). <br /> 3.2.2 Utility Clearance <br /> APTIM will contact USA North 811 Underground Service Alert for a DigAlert ticket approximately one week <br /> in advance, but no less than three full business days before subsurface field activities.The DigAlert ticket <br /> will be renewed, as necessary, until intrusive investigation work is complete. In addition, a private utility <br /> locator will clear each of the boring locations. Multiple geophysical methods may be used for underground <br /> utility clearance, which include the following: <br /> • Ground-penetrating radar <br /> • Frequency domain electromagnetic survey techniques <br /> • Conventional utility location techniques, active/induction/passive modes <br /> Boring locations will be adjusted, as needed, based on the geophysical utility surveys. Based on the <br /> geophysical survey and utility markings,APTIM may request a variance to hand digging to 5 feet bgs from <br /> our Corporate Environmental Safety Group. Otherwise, each boring will be cleared by hand-auguring <br /> approximately 5 feet bgs before downhole drilling equipment will be introduced. <br /> With a representative of the building, the indoor subsurface investigation locations will be marked and <br /> cleared for subsurface obstructions and utilities with geophysical equipment. If geophysical equipment <br /> FINAL RIPON PCE INVESTIGATION WORK PLAN.DOCX 3-1 PROJECT NO.631021512 <br />
The URL can be used to link to this page
Your browser does not support the video tag.