Laserfiche WebLink
cannot access the area,sampling locations will be based on as-built building plans,owner knowledge, and <br /> property conditions.These locations will not be exempted from hand digging. <br /> 3.2.3 Health and Safety Plan and Meetings <br /> Appendix A contains the site-specific health and safety plan (HASP) for use by personnel during <br /> implementation of the work plan. The HASP is consistent with Occupational Health and Safety <br /> Administration and the California Occupational Health and Safety Administration guidelines. The HASP <br /> will be reviewed by field staff and contractors prior to the commencement of fieldwork. <br /> Daily tailgate safety meetings will be held before starting work. Field staff, including subcontractors, will <br /> attend these meetings and sign a tailgate safety meeting form. Other visitors such as RWQCB, inspectors, <br /> or personnel that visit the Site during the course of the day will be given a safety briefing by the APTIM <br /> field staff and asked to sign the HASP prior to entering the work site or else remain outside the work <br /> zones. <br /> 3.2.4 Temporary Facilities <br /> APTIM assumed no temporary facilities will be needed at the Site. It is assumed restrooms will be utilized <br /> off site and water will be available at the Site. Security fencing is not necessary. <br /> 3.2.5 Traffic Control <br /> Work performed in or near roadways will be coordinated with the City of Ripon, local tenants, and/or <br /> other stakeholders to implement appropriate traffic control and lane closures as needed for public and <br /> Site personnel safety.Traffic impacts are expected to be minimal along Locust Avenue. Right of way lane <br /> closures and traffic diversions may be required during installation of soil gas probes and soil borings for <br /> groundwater samples. Where needed,APTIM will utilize safety cones and flagging while installing soil gas <br /> probes and advancing soil borings. <br /> Upon approval of sampling locations, if needed, a traffic plan will be prepared and submitted to the City <br /> of Ripon for approval. <br /> FINAL RIPON PCE INVESTIGATION WORK PLAN.DOCX 3-2 PROJECT NO.631021512 <br />