My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085020 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
311
>
2900 - Site Mitigation Program
>
SR0085020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 8:56:22 AM
Creation date
10/19/2022 8:38:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085020
PE
2903
FACILITY_ID
FA0027064
FACILITY_NAME
UNKNOWN PCE RIPON
STREET_NUMBER
311
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25907008
ENTERED_DATE
3/17/2022 12:00:00 AM
SITE_LOCATION
311 W MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Notifies the SS and SHSO of suspected unsafe conditions <br /> — Reports all incidents to the SS and SHSO <br /> 3.6 Contractor/Subcontractor Health and Safety <br /> This section of the HASP outlines general requirements for contractors /subcontractors including HASP <br /> development, correction of safety violations, and other general requirements. <br /> Contractor HASP Development <br /> Each APTIM Approved contractor performing work on this project shall develop a health and safety plan <br /> which addresses worker, subcontractor(s) and public safety specific to their scope of work. The <br /> contractor's HASP must comply with APTIM policies and all applicable statutes, federal, state and local <br /> regulations and codes. <br /> The contractor's HASP shall include a written summary of job hazards (e.g., JSA) for all major tasks they <br /> will perform on site and submit them to the SHSO for review prior to the start of that task. The <br /> contractor shall amend the HASP to reflect scope of work changes. <br /> The contractor will provide a copy of the HASP for APTIM personnel to review within ten (10) days of <br /> award of a contract or at least 10 days prior to commencement of work activities at the site, whichever <br /> occurs last.The review does not warrant that the HASP will be sufficient for the proposed work. <br /> Each individual subcontractor must make an independent determination of the applicability of <br /> contractor's HASP to his/her work. If the subcontractor adopts the contractor's HASP, the HASP <br /> becomes their responsibility to implement as it pertains to their work. The subcontractor assumes all <br /> liabilities for such adoption and implementation. All subcontractor personnel will read and sign the <br /> contractor's HASP. <br /> Prior to the starting of work on this project all contractor and subcontractor personnel will receive the <br /> site orientation from the contractor's SSO. An orientation is a general overview of the site only. The <br /> contractor shall be prepared to conduct site specific training or have qualified personnel for the hazards, <br /> tasks, equipment/tools required to complete the project. If English is not the dominant language of the <br /> contractor's personnel,the contractor shall provide an interpreter to help facilitate the orientation. <br /> All contractor safety related incidents including near misses, shall be reported to the SSO immediately. <br /> Correction of Safety Violations <br /> Every employer on the project site has an obligation to prevent or correct hazards and to protect all <br /> employees from exposure to such conditions if they exist. To assure these obligations are being met, <br /> contractors and subcontractors will be subject to frequent inspection by APTIM. The <br /> 3-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.