My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085020 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
311
>
2900 - Site Mitigation Program
>
SR0085020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 8:56:22 AM
Creation date
10/19/2022 8:38:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085020
PE
2903
FACILITY_ID
FA0027064
FACILITY_NAME
UNKNOWN PCE RIPON
STREET_NUMBER
311
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25907008
ENTERED_DATE
3/17/2022 12:00:00 AM
SITE_LOCATION
311 W MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Per the September 9, 2021, call with the Regional Board, APTIM revised the March 13, 2020, scope of <br /> work. Previously the scope of work requested installation and sampling of five soil gas monitoring wells <br /> near the former cleaners. The revised scope of work will use passive soil gas sampling, which will allow <br /> the screening of a greater number of locations. The passive soil gas sampling will be conducted behind <br /> the former Ripon Cleaners building at 311 West Main Street, in close proximity to the existing sanitary <br /> sewer lateral.The sample location siting will take into account utility locating and video inspection results <br /> of the sanitary sewer lateral. Additionally, up to three other locations to the west of the Site will also <br /> utilize passive soil gas sampling to evaluate potential of volatile organic compound (VOC) migration <br /> toward the nearby residences. Per the RWQCB, up to four passive soil gas samplers will be installed near <br /> two, and up to three, separate residences as discussed in Section 4. <br /> This work plan provides the following information: <br /> • Section 1—Introduction <br /> • Section 2—Site Description and Background <br /> • Section 3—Pre-Field Activities <br /> • Section 4—Field Investigation Activities <br /> • Section 5—Vapor Intrusion Evaluation <br /> • Section 6—Scheduling and Reporting <br /> • Section 7— References <br /> FINAL RIPON PCE INVESTIGATION WORK PLAN.DOCX 1-2 PROJECT NO.631021512 <br />
The URL can be used to link to this page
Your browser does not support the video tag.