My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085020 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
311
>
2900 - Site Mitigation Program
>
SR0085020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 8:56:22 AM
Creation date
10/19/2022 8:38:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085020
PE
2903
FACILITY_ID
FA0027064
FACILITY_NAME
UNKNOWN PCE RIPON
STREET_NUMBER
311
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25907008
ENTERED_DATE
3/17/2022 12:00:00 AM
SITE_LOCATION
311 W MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Use vehicle to block work area. <br /> • Engage police detail for high-traffic situations. <br /> • Always use a spotter in tight or congested areas for material deliveries. <br /> – Review APTIM Procedure AMS-710-02-PR-02700 Vehicle Safety. <br /> 6.1.19 Noise <br /> Observe APTIM Procedure AMS-710-01-PR-0900. In addition, observe the following procedures and <br /> practices regarding noise: <br /> • Wear hearing protection when equipment such as a drill rig,jackhammer, cut saw, air compressor, <br /> blower or other heavy equipment is operating on the site. <br /> • Wear hearing protection whenever it is necessary to speak above normal conversational speech <br /> due to loud noise—this much noise indicates the need for protection. <br /> – Conduct noise monitoring of suspected high noise operations at the beginning of <br /> the workday or start of new operations to verify noise control/hearing protection <br /> requirements. <br /> 6.1.20 Lifting and Material Handling <br /> Review APTIM procedure AMS-710-01-PR-03700. Observe the lifting and material handling procedures <br /> and practices: <br /> • Use leather gloves when handling metal, wire rope, sharp debris, or transporting materials (wood, <br /> piping, drums, etc.). <br /> • The size, shape, and weight of the object to be lifted must first be considered. No individual <br /> employee is permitted to lift any object that weights over 60 pounds. Multiple employees or <br /> mechanical lifting devices are required for objects over the 60-pound limit. <br /> • Plan a lift before doing it. Bend at the knees and lift with the legs; keep the natural curves of the <br /> back; do not use back muscles. <br /> • Check route for clearance. <br /> • Use the buddy system when lifting heavy or awkward objects. <br /> • Do not twist body while lifting. <br /> 6-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.