Laserfiche WebLink
s <br /> } <br /> RESOURCE AND RECOVERY <br /> &R) <br /> 1. . Grinding Pad <br /> R& R's grinding pad is a one(1)acre cement pad. The cement pad has been <br /> constructed in such a way that water flows to the Northwest Corner where it <br /> transfers to a ditch and is delivered to a sediment pond located South of the <br /> South Fork of Little John's Creek in the Western Corner of R& R. <br /> 2. Compost Pad <br /> Composting continues on a yearlong schedule on Forward's Winterized <br /> Composting Pad. Run-off from the pad is directed to the sediment pond <br /> through ditches on both the North and South side of the Composting Pad. <br /> 3. Sediment pond <br /> All water having been directed to Forward R&R sedimentation pond is <br /> sampled and analyzed in accordance with Forward's Stormwater Pollution <br /> Prevention Plan and Stormwater Monitoring Plans, prior to discharge to the <br /> South Fork of Little John's Creek. A log is kept on site recording the volume <br /> of Stormwater discharged to the creek. <br />