Laserfiche WebLink
0 <br /> 3.0 SCOPE OF WORK <br /> The scope of work within this work plan includes the installation of three new Title 27 <br /> compliance monitoring probes along the western edge of the site property line. These <br /> probes are being installed to replace the now destroyed GP-1, GP-2, and GP-3. <br /> Additionally, replacement of the remaining seven existing probes located at the site's <br /> perimeter is also proposed under this work plan in order to bring all probes in compliance <br /> with Title 27 requirements. <br /> The following site activities will be conducted as part of this work plan. These activities are <br /> as follows: <br /> • Permit all LFG monitoring probes. <br /> • Drill LFG monitoring probe borings. <br /> • Construct and install LFG monitoring probes. <br /> • Backfill and restoration of surface. <br /> • Survey new LFG monitoring. <br /> • Prepare as-built Probe Location Map. <br /> 3-1 <br /> Multilevel LFG Monitoring Probe Installation Work Plan <br /> L:\Allied\Forward Landfill\2001.132\Reports\Workplan\Sect-3rev2.doc:7/1/02 <br />