Laserfiche WebLink
r. B ardm March 1, 2000 <br /> 9 <br /> ➢ Please provide as-built drawings/plans for the existing gas monitoring probes. <br /> ➢ Please provide the result of gas monitoring for the previous 12 (twelve) quarters of monitoring. <br /> Cost Estimate <br /> ➢ 27 CCR, §21820 states that the operator shall provide a written cost estimate,in current dollars,of the <br /> cost of hiring a third party to close the landfill in accordance with the submitted closure plan. <br /> However, the cost estimate included in the Plan does not include the total cost of hiring a third party. <br /> Please revise the cost estimate and resubmit. <br /> ➢ If the on-site soil is not adequate to use as final cover, the operator will then need to determine and <br /> include it in the Plan, where soil for final cover will be obtained from. The cost associated with this <br /> shall be included in the cost estimate. <br /> The cost estimate(table 5-1) must also include the following: <br /> I. Final Cover Construction. <br /> 11. Final Cover CQA testing. <br /> M. Drainage system construction. <br /> IV. Gas control system installation. <br /> Please be advised that Partial Final Closure and Post-Closure Maintenance of this site may be subject to <br /> the environmental review under the California Environmental Quality Act(CEQA). Evidence of the <br /> initiation of the CEQA process must be submitted to the Board. A Notice of Determination for this <br /> project is required prior to Board approval of the Plan. Please submit any documents that have been <br /> prepared to comply with CEQA that addresses any significant environmental impacts and mitigating <br /> measures associated with closure and post-closure maintenance of this site. <br /> When resubmitting plans, the owner/operator may either resubmit new copies of the revised Plans, or <br /> submit revised pages for insertion into the current Plan. The revision number and date are to be indicated <br /> on each revised page and/or drawing. A revised title page indicating the original plan date and all revision <br /> numbers and dates is required. A new table of contents page, if necessary, is also required. <br /> We thank you for the opportunity to comment. Please call me at (916)255-1301 if you have any <br /> questions or if I can be of further assistance <br /> Sincerely; <br /> Gino Yek <br /> Waste M agement Engineer <br /> California Integrated Waste Management Board <br /> Cc: Mr. Ross D. Atkinson,RWQCB—Central Valley Region <br /> Mr. Robert McClellan, San Joaquin County LEA <br /> Mr. Curt Fujii, Forward Inc <br /> Mr. Michael B. Wochnick, P.E.,CIWMB <br />