Laserfiche WebLink
Mr. Chandler Martin - 2 - 2 December 2002 <br /> Mitigation Monitoring Action Requirements or Action <br /> Number <br /> 46 Liner and leachate collection Required by Title 27 and the facility WDRs. <br /> system desi2. <br /> Separation between liner and Required by Title 27 and the facility WDRs. <br /> groundwater. <br /> Leak detection system. Required by Title 27 and the facility WDRs. <br /> Operations layer over liner. Required by Title 27 and the facility WDRs. <br /> Double liner under sump area. Revised facility WDRs will require this. <br /> Electrical testing of each Revised facility WDRs will require electrical testing of <br /> WMU liner. the liner. <br /> RWQCB required changes Title 27 allows changes to prescriptive WMU design if <br /> necessary to protect water guality. <br /> 47 -Engineering leachate controls Required by Title 27 and the facility WDRs. <br /> Leachate monitoring Required by Title 27 and the facility WDRs. <br /> Leachate re ortin controls Required by Title 27 and the facility WDRs. <br /> RWQCB and DTSC required Title 27 requires that appropriate corrective actions be <br /> changes implemented to abate any release that threatens water <br /> quality. <br /> 48 Desigh for pre-loaded Required by Title 27 and the facility WDRs. <br /> settlement <br /> Future design of vertical Required by Title 27 and the facility WDRs. <br /> expansion <br /> Maintain extraction wells The extraction wells are part of corrective actions to <br /> remediate groundwater contamination from the old <br /> Austin Road WMU. Title 27 and facility WDRs require <br /> that the convective actions be maintained and if necessary <br /> improved until cleanup goals are achieved. <br /> CIWMB and RWQCB review Required by Title 27 and the facility WDRs. <br /> vertical expansion design. <br /> 49 -Sample off-site wells to east. Required by Title 27 and the facility WDRs. <br /> Sample additional off--site Required by Title 27 and the facility WDRs. <br /> wells. <br /> Extract/treat VOCs in offsite Extraction and treatment of groundwater to remove <br /> plume VOCs is part of corrective actions to remediate <br /> groundwater contamination from the old Austin Road <br /> WMU. Title 27 and facility WDRs require that the <br /> corrective actions be continued and if necessary improved <br /> until cleanup goals are achieved. <br /> 50 Infiltration of treated Infiltration of treated groundwater is part of corrective <br /> groundwater. actions to remediate groundwater contamination from the <br /> old Austin Road WMU. Title 27 and facility WDRs <br /> require that the corrective actions be continued and if <br /> necessary improved until cleanup goals are achieved. <br />