Laserfiche WebLink
Mr. Chandler Martin - 3 - 2 December 2002 <br /> Mitigation Monitoring Action Requirements or Action <br /> Number <br /> 51 Replace groundwater Title 27 and the facility WDRs require a groundwater <br /> monitoring wells. monitoring system adequate to detect releases from any <br /> unit. As the landfill expands old monitor wells will be <br /> decommissioned and new wells installed as appropriate <br /> to comply with this requirement. <br /> 52 Timing of discharge of This requirement is not at this time required in facility <br /> detention pond. WDRs and so far as staff is aware the Austin Road <br /> detention pond has never discharged. The WDRs will.be <br /> revised to include this as a requirement. <br /> 56 Modify seismic design if Required by Title 27 and the facility WDRs. <br /> needed <br /> Monitor liner and drainage Required by Title 27 and the facility WDRs. <br /> system <br /> 57 Seismic design requirements of Required by Title 27 and the facility WDRs. <br /> Title 27. <br /> 58 Implement erosion Required by Title 27 and the facility WDRs. <br /> mans ementplan. <br /> Reve etate completed cells Required by Title 27 and the facility WDRs. <br /> Erosion Controls on temporary Required by Title 27 and the facility WDRs. <br /> slopes <br /> Monitor erosion control Required by Title 27 and the facility WDRs. <br /> measures <br /> 59 Assess groundwater level after This requirement is not at this time required in facility <br /> earthquake. WDRs. Revised WDRs will include this as a <br /> requirement. <br /> 60 Benchmarks to monitor Required by Title 27 and the facility WDRs. <br /> settlement. <br /> 63 Monitor and maintain creek This is not required in facility WDRs and is apparently a <br /> realignment. Corps of Engineers or Department of Fish and Game <br /> requirement. <br /> 64 Monitor riparian vegetation. This is not required in facility WDRs and is apparently a <br /> Corps of Engineers or Department of Fish and Game <br /> requirement. <br /> 65 4.3-acre detention basin. Permitted in WDRs to be constructed as needed. <br /> As you may know,the WDRs are currently undergoing revision to permit expansion and operation of the <br /> combined landfill. Revised WDRs cannot be submitted to the board for adoption until the CEQA process <br /> is complete. Staff will include the revisions in the new WDRs as noted above. <br />