My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084051 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
SR0084051 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 1:19:52 PM
Creation date
10/26/2022 1:17:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084051
PE
2903
FACILITY_ID
FA0024553
FACILITY_NAME
SHARPE ARMY DEPOT OFF SITE EXTRACTION WELL INSTALLATION
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
94523
APN
19802001
ENTERED_DATE
8/10/2021 12:00:00 AM
SITE_LOCATION
700 ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP-010 Standard Operating Procedure <br />Well Construction Page 4 of 11 Revision No. 0 March 2020 <br /> <br />Sharpe Army Depot <br />the project work plans. Review all forms and diagrams documenting the location of the cleared monitoring well site and the location of any identified underground utility lines or other buried objects. <br />4.2.2 Decontaminate <br />Decontaminate all downhole equipment and well construction materials before monitoring or extraction well installation. Decontaminate the drilling rig and all drilling equipment before monitoring or extraction well installation per SOP-003 (Equipment Decontamination Procedures). <br />4.2.3 Calibrate <br />Calibrate health and safety monitoring equipment according to the instrument manufacturer's specifications. Document the calibration results on the appropriate form(s). Instruments that cannot be calibrated according to the manufacturer's specifications will be removed from service and tagged. <br />4.2.4 Personal Protective Equipment (PPE) <br />Workers will be provided with, and don the appropriate personal protective equipment as specified by the project work plans. Typically, the minimum personal protection will include a hard hat, safety glasses, gloves, steel-toed boots, hearing protection, and coveralls. <br />4.3 Mobilization and Set-up <br />4.3.1 Mobilize <br />Clear the work site of all brush and minor obstructions and then mobilize the rig to the monitoring well location. <br />4.3.2 Discuss Site Conditions <br />The rig geologist or engineer should then review with the driller the proposed well design and details of the well installation, including any anticipated potential drilling or completion problems. <br />4.4 Well Installation <br />4.4.1 Drilling <br />Drilling of the borehole should be conducted in conformance with SOP-006 (Mud Rotary Drilling). <br />Commence drilling and advance the borehole while conducting health and safety monitoring according to the project work plans. Perform readings as often as necessary to ensure the safety of workers. <br />4.4.2 Ongoing Recording <br />Record all measurements and pertinent information on the Field Activity Daily Log (FADL), on other appropriate form(s) as specified in the project work plans, and in conformance with SOP-002 (Field Activity Records): <br />• Date <br />• Site <br />• Well or boring number <br />• Location
The URL can be used to link to this page
Your browser does not support the video tag.