Laserfiche WebLink
Geosyntec <br /> consultants <br /> has been accepted for disposal by an appropriate licensed disposal facility, the Port or an <br /> authorized representative of the Port will sign the waste manifest and the IDW drums will be <br /> transported off-site by AIS to the disposal facility. The IDW is anticipated to be non-hazardous <br /> and therefore is expected to be disposed of at the Crosby and Overton facility in Long Beach, <br /> California. <br /> RRI Groundwater Monitoring Work Plan 20 June 2022 <br />