Geosyntec <br /> consultants <br /> 6. SCHEDULE AND REPORTING <br /> Upon DTSC and CVRWQCB approval of this 2022 GMWP, the drilling contractor will be <br /> scheduled for the three new proposed monitoring wells. If approval is received by August 15, <br /> then monitoring well installations and the 2022 groundwater monitoring event will take place <br /> before the end of the third quarter 2022. The results of the 2022 monitoring event and the <br /> documentation of the new monitoring well installations will be provided in the 2022 Annual <br /> Groundwater Monitoring Report, which will be submitted to DTSC and the CVRWQCB within <br /> 90 days of completion of the 2022 groundwater monitoring field activities. The 2022 Annual <br /> Groundwater Monitoring Report will include summary tables of the groundwater results, figures <br /> with posted cis-1,2-DCE and VC results and isoconcentration contours developed based on the <br /> professional judgement of a California licensed Professional Geologist, updated hydrographs, <br /> updated head difference graphs, groundwater monitoring well VOC concentration over time <br /> graphs, and concentration trends for COCs with eight or more samples in the last 20 years that <br /> were sampled during the 2022 monitoring event. The 2022 laboratory reports will be uploaded to <br /> GeoTracker when the 2022 Annual Groundwater Monitoring Report is submitted to DTSC and <br /> CVRWQCB. <br /> RRI Groundwater Monitoring Work Plan 21 June 2022 <br />