Laserfiche WebLink
screened or “open hole” below the steel casing. <br />3. Well MW-7 was installed by Secor/West Hazmat drilling in August 2000. Since that time, <br />improvements to the residence have been made that make access to the well impossible, <br />including shade awnings, fencing, etc. Overhead lines also prevent appropriate clearances <br />needed by the drilling rig(see photos attached). <br />  <br />For the reasons stated above (proximity to domestic well, unknown details of domestic well, and lack <br />of access to overdrill the well) Condor request a variance from EHD’s monitoring well destruction <br />guidelines to destroy well MW-7 by pressure grouting without the use of explosives. We are on-site <br />at this very moment and have just completed well destructions for all other monitoring wells and <br />request your decision today so that we will not need to re-mobilize to the site. I apologize for the <br />short notice, as we were only informed of these concerns late yesterday afternoon. <br />  <br />Thank you very much for your quick consideration. <br />  <br />Best, <br />  <br />John Lane, PG <br />Condor EarthOffice: 209-938-1061 <br />Mobile: 209-743-7443 <br />jlane@condorearth.com <br />  <br />From: John Lane  <br />Sent: Wednesday, November 3, 2021 9:36 AM <br />To: Jeff Wong, [EHD] <Jwong@sjgov.org>; agooderham@sjgov.org; Kaleb Ledford <br /><kledford@condorearth.com>; Luke Castle <lcastle@condorearth.com> <br />Subject: Ranch Market MW-7 Well Destruction <br />  <br />Jeff,  <br />  <br />I just left a long voicemail re concerns about explosives on MW-7 expressed by home owner. Please <br />listen and  discuss with Aaron and call me re variance to pressure grout. <br />  <br />Thank you, <br />  <br />John Lane <br />Condor Earth <br />  <br />Sent via Mobile Phone <br />