My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084289 (3)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
SR0084289 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 1:45:27 PM
Creation date
10/26/2022 1:43:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084289
PE
2903
FACILITY_ID
FA0025316
FACILITY_NAME
FORMER RANCH MARKET
STREET_NUMBER
23569
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
APN
24907012
ENTERED_DATE
9/29/2021 12:00:00 AM
SITE_LOCATION
23569 SANTA FE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CONDOR EARTH SITE SPECIFIC HEALTH & SAFETY PLAN <br />FOR WORKING WITH PETROLEUM HYDROCARBONS, <br />ORGANIC VAPORS AND LIQUID CONTAMINANTS <br /> <br /> <br />1.0 INTRODUCTION <br />Condor Earth (Condor) has adopted the following Health & Safety Plan for working with petroleum <br />hydrocarbons, organic vapors, and liquid contaminants that may be encountered during investigative <br />excavation and sampling operations. Condor technicians will employ photoionization detector (PID) <br />organic vapor monitoring technology to monitor exposure in order to meet Short Term Exposure Limit <br />(STEL) requirements. The purpose of this plan is to provide health and safety precautions for the initial and <br />subsequent site visits until the nature and magnitude of the contaminants have been evaluated. <br /> <br />All work will be done in general accordance with current OSHA regulations and all personnel working <br />within the exclusion zone at the project site will have completed a 40-hour OSHA training course. A tailgate <br />safety meeting will be held prior to commencement of work each day and a Health & Safety Plan will be <br />discussed with and presented to all crewmembers for their signatures. <br /> <br />This Health & Safety Plan is limited to provisions for safe work practices related to exposure to petroleum <br />products in soil. The suspected contaminants are listed on the contact information page. <br /> <br />2.0 GENERAL SAFETY MEASURES <br />Access to the project site shall be limited by the exclusion zone. The exclusion zone shall include an area <br />at least ten feet from the sampling location and sampling equipment. Non-authorized personnel shall not be <br />allowed in the exclusion zone. No smoking will be allowed in the exclusion zone. <br /> <br />All Condor personnel, subcontractors, and consultants shall adhere to the provisions of the Condor Site Safety <br />Plan including all applicable elements of the Condor Illness and Injury Prevention Program (IIPP). <br /> <br />All of the above personnel who participate in fieldwork at the site will attend a safety indoctrination provided <br />by the Condor Site Safety Officer. The Condor Site Safety Plan is maintained in this work plan. Copies of this <br />work plan shall be available to all working units of Condor, its subcontractors and consultants. <br /> <br />2.1 SITE SAFETY OFFICER RESPONSIBILITIES <br />The Site Safety Officer shall monitor all activities of equipment and personnel at the project site. Site Safety <br />Officer responsibilities will include the following: <br /> <br />1. Limiting access to the exclusion zone to authorized personnel. <br />2. Providing written log of on-site activities and events. <br />3. Notification of regulatory agencies during emergency procedures. <br />4. Enforcement of contaminant exposure site safety precautions. <br />5. Document all injuries and safety incidents. <br /> <br />During investigation in soils containing petroleum hydrocarbons, all personnel shall undertake the <br />following precautions: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.