Laserfiche WebLink
Phase II ESA – Work Plan <br />206 N. Sutter Street <br />Stockton, San Joaquin County, California <br />Page 3 <br /> <br /> <br /> <br />7.0 PROJECT SCHEDULE <br />Condor will schedule the subsurface investigation upon permit approval by EHD. Laboratory results are <br />expected within two weeks of conducting the sampling. A report can be submitted to the Client within <br />four weeks of the completion of the fieldwork. If you need additional information or have any questions, <br />please call Luke Castle at (209) 536-7379. <br /> <br />Respectfully submitted, <br /> <br />CONDOR EARTH <br /> <br /> <br /> <br /> <br />Luke Castle, PG #9945 <br />Associate Geologist <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />X:\Project\7000_prj\7454 Ten Space Development - OWP, LLC\7454G Phase II ESA\Reports\Workplan\WP 20220804.doc <br />