Laserfiche WebLink
Project Hazard Identification, Risk Assessment and Control (HIRAC) Form <br />32 <br />DRILLING ACTIVITIES <br />Potential <br />Hazards <br />Initial Risk <br />Ranking <br />(R/Y/G) <br />Hazard Controls <br />(including PPE requirements) <br />Applicable Policy or <br />Procedures <br />Residual Risk <br />Ranking (R/Y/G) <br />• Mark overhead utilities (e.g., warning tape, flags, etc.) <br />where heavy equipment, or other equipment, has the <br />potential for contact. <br />• Maintain a minimum clearance of 10 feet between the <br />overhead lines and employees and other conductive <br />materials (e.g., mechanical equipment, vehicles, drill rig <br />structures, etc.) <br />• If voltage of the overhead line is unknown, remain at least <br />20 feet away from the line. <br />• Refer to Table 10-1 for specific clearance distances based <br />upon line voltages. <br />• Utilize a Spotter when it is possible to violate the minimum <br />clearance distance requirements. Pre-plan communications <br />between the Spotter and equipment operators. <br />• If having to perform work within a restricted distance to an <br />overhead line then actions should be taken, such as de- <br />energizing and grounding the line or installation of <br />protective line insulators. <br />Table 10-1: Overhead <br />Utility Clearance Distances <br /> <br />Moving and <br />rotating parts and <br />equipment <br /> <br />(Struck by and <br />entrainment <br />related injuries) <br />R • Equipment guards shall be in place around any rotating <br />equipment or personnel otherwise protected from this <br />hazard by distance. <br />• At the beginning of the work shift test that drill rig <br />emergency stops are operating properly. <br />• Set up sampling area away from drilling operations. <br />• Drilling in streets, parking lots or other areas of vehicular <br />traffic requires definition of the work zone with cones, <br />warning tape, work vehicles, etc. and compliance with local <br />ordinances. <br />HSE Manual, Section 26 – <br />Hand Tools and Equipment <br /> <br />HSE Manual, Section 30 – <br />Working with Geotechnical <br />/ Environmental Drilling <br />Rigs <br />Y