My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085271 (3)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
17
>
2900 - Site Mitigation Program
>
SR0085271 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2022 10:55:50 AM
Creation date
11/1/2022 10:53:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085271
PE
2903
FACILITY_ID
FA0027175
FACILITY_NAME
MAJ STOCKTON, LLC
STREET_NUMBER
17
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730019
ENTERED_DATE
5/13/2022 12:00:00 AM
SITE_LOCATION
17 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan <br />17 West Washington Street, Stockton, California 95202 <br />461803 <br /> <br /> Page 2 <br />4.0 GENERAL SUBSURFACE CLEARANCE REQUIREMENTS <br />If the Tasks presented in Section 1.1 involve subsurface work, the following sections are <br />applicable and must be followed. The Subsurface Clearance (SSC) Form (Table 5) must be <br />completed before Site work commences. This table must be completed in its entirety. Also, all <br />other pertinent requirements that must be met for subsurface work are identified in AEI’s July <br />2019 SSC Policy (Appendix C) and must be followed. <br />Table 5: Subsurface Clearance (SSC) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subsurface <br />Clearance <br />(SSC) <br /> <br />Document the <br />steps that must <br />be followed and <br />justify any <br />exceptions. <br /> <br />This table <br />MUST be <br />completed in <br />its entirety. <br />SSC Requirement Yes <br /> <br />No NA Comments: <br />Prequalification of <br />Contractor for SSC <br />capability performed <br />܆܆ տ տ <br /> <br />“Designated Person” <br />(e.g., AEI PM) for SSC <br />work assigned <br />տ տ տ <br /> <br />Site information <br />reviewed տ տ տ <br />Facility Plans and previous <br />work completed on site by <br />other consultants. <br />Site walkover including <br />the approval of locations <br />by facility personnel and <br />service notifications <br />provided? <br />տ տ տ <br /> <br />Underground utilities <br />identified prior to <br />commencement of <br />intrusive activities as <br />reasonably feasible <br />܆ տ տ <br />Dig Safe must be <br />previously notified and <br />have cleared the site for <br />subsurface work. <br />Dig Safe Notification <br />Date:Click or tap here to <br />enter text. <br />Consider/document <br />“Critical Zones” (i.e., <br />locations of known <br />underground utilities) as <br />reasonably feasible <br />տ տ տ <br /> <br />Will all drilling points be <br />manually cleared if <br />unknown hazards exist <br />or slant borings be <br />conducted? <br />տ տ տ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.