My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084326
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
701
>
2900 - Site Mitigation Program
>
SR0084326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 10:25:52 AM
Creation date
11/16/2022 10:23:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084326
PE
2903
FACILITY_ID
FA0019555
FACILITY_NAME
CITY OF STKN REDEVELOPMENT AGENCY
STREET_NUMBER
701
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
14527009
ENTERED_DATE
10/8/2021 12:00:00 AM
SITE_LOCATION
701 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sampling and Analysis Plan for <br /> Phase II Environmental Site Assessment <br /> South Pointe Property: 701, 705, 833, 855 West Weber Avenue <br /> Stockton, California <br /> Project and Data Quality Objectives <br /> May 17, 2021 <br /> Table 3-6 <br /> Key Project Roles and Responsibilities <br /> Stantec Project Manager <br /> ✓ Plan, coordinate, monitor,and evaluate project field activities. <br /> Prior to file work, meet with the Stantec QA manager and field staff to discuss and establish sampling <br /> ✓ purposes, sampling methodology, number of samples, size of samples,sample preservation methods, chain- <br /> of-custody(COC)requirements,analyses required,and which samples will be duplicated in the field. <br /> ✓ Resolve technical problems. <br /> ✓ I Meet with team members to discuss and review analytical results prior to completion of reports. <br /> ✓ Submit documents for internal quality and independent reviews; reviewers will be selected based on expertise <br /> needed. <br /> ✓ Responsible for coordinating completion of final reports and documents. <br /> Stantec QA Manager <br /> ✓ Oversee assessment activities to ensure that sampling methodology, sample preservation methods, and COC <br /> procedures are followed. <br /> ✓ Provide QA/quality control (QC)oversight for adherence to USEPA grant program standards and in <br /> accordance with the approved QAPP. <br /> ✓ Perform or oversee data validation. <br /> ✓ Assist with any QA issues regarding field or laboratory questions, as needed. <br /> ✓ Provide expert-level review and QA/QC oversight for technical project elements. <br /> ✓ Conduct field audits and confirm completion of corrective actions. <br /> ✓ Maintain a record of samples submitted to the laboratory,the analyses performed on each sample,final <br /> analytical results,and data validation reports. <br /> ✓ Prepare Data Assessment Reports and provide those reports to the USEPA project manager. <br /> ✓ Oversee subcontractor laboratory performance to ensure data deliverables meet project needs. <br /> Stantec Data Manager <br /> ✓ Maintain a record of samples collected including sample identification information for each sample. <br /> ✓ Manage data acquired from field assessments and laboratory analyses. <br /> ✓ Assemble data into spreadsheet or table format. <br /> B <br /> Project No.: 185704833.5.3&5.4 3.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.