Laserfiche WebLink
Sampling and Analysis Plan for <br /> Phase II Environmental Site Assessment <br /> South Pointe Property: 701, 705, 833, 855 West Weber Avenue <br /> Stockton, California <br /> Field Methods and Procedures <br /> May 17, 2021 <br /> 6.4 PASSIVE SOIL VAPOR SAMPLING <br /> Passive soil vapor sampling modules will be installed at 40 locations across the site as illustrated on <br /> Figure 3. Installation and retrieval procedures will adhere to the SOP presented in Appendix C. Sample <br /> modules will remain in place prior to retrieval and shipment to the analytical laboratory. Sample handling <br /> procedures are presented in Section 7. <br /> 6.5 ACTIVE SOIL VAPOR SAMPLING <br /> Active soil vapor sampling will be completed at an estimated ten locations based on results of the passive <br /> soil vapor survey(that is, active soil vapor sampling will be conducted in areas of the site with the highest <br /> reported mass accumulations of VOCs in subsurface soil vapor, and/or at locations where elevated mass <br /> is measured for VOCs of particular concern relative to potential vapor intrusion—such as trichloroethene, <br /> tetrachloroethene, and benzene). At each location, a direct-push drilling rig will be used to extend a <br /> borehole to approximately 12.5 feet below grade. A soil vapor collection probe consisting of a stainless <br /> steel or Teflon TM inlet fitting connected to '/-inch Teflon tubing will be installed at approximate depths of <br /> 12 and 5 feet below grade. The inlet fittings will be installed at the mid-point of 12 inches of bedding sand, <br /> followed by at least a foot of unhydrated granular bentonite. The probes will be 'nested', that is, both <br /> probes installed within a single borehole. The annular space between the deep and the shallow probe will <br /> be sealed with hydrated bentonite installed in six-inch lifts, as will the annular space in the upper 3 feet of <br /> the borehole (between the shallow probe and the ground surface). The two lengths of tubing will be <br /> labeled relative to their'shallow' or'deep' positions using zip ties and metal tags, sealed using a plastic <br /> plug, and coiled inside an 8-inch-diameter flush mount vault box installed in quick-set concrete. <br /> After allowing the soil vapor probes to equilibrate for at least 48 hours, soil vapor sampling will be <br /> conducted in accordance with California DTSC sampling guidance (Advisory, Active Soil Gas <br /> Investigations, July 2015). Soil vapor sampling procedures are described in the SOP included in <br /> Appendix C. Sample handling procedures are presented in Section 7. <br /> 6.6 DECONTAMINATION PROCEDURES <br /> Non-dedicated, reusable equipment will be decontaminated before use and between locations in <br /> accordance with the SOP included in Appendix C. Equipment will be decontaminated in a pre-designated <br /> area on pallets or plastic sheeting, and clean bulky equipment will be stored on plastic sheeting in <br /> uncontaminated areas. Cleaned small equipment will be stored in plastic bags. Materials to be stored <br /> more than a few hours will also be covered. <br /> B <br /> Project No.: 185704833.5.3&5.4 6.3 <br />