My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084326
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
701
>
2900 - Site Mitigation Program
>
SR0084326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 10:25:52 AM
Creation date
11/16/2022 10:23:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084326
PE
2903
FACILITY_ID
FA0019555
FACILITY_NAME
CITY OF STKN REDEVELOPMENT AGENCY
STREET_NUMBER
701
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
14527009
ENTERED_DATE
10/8/2021 12:00:00 AM
SITE_LOCATION
701 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sampling and Analysis Plan for <br /> Phase II Environmental Site Assessment <br /> South Pointe Property: 701, 705, 833, 855 West Weber Avenue <br /> Stockton, California <br /> Sample Containers, Preservation, Packaging and Shipping <br /> May 17, 2021 <br /> 7. Seal sample containers in heavy duty plastic zip-lock bags. Write the sample numbers on the <br /> outside of the plastic bags with indelible ink. <br /> 8. Samples will be placed into a sturdy cooler(s) lined with a large plastic trash bag. The appropriate <br /> COC(s)will be placed in a zip-lock plastic bag affixed to the underside of the cooler lid. <br /> 9. Empty space in the cooler will be filled with bubble wrap or Styrofoam peanuts to prevent <br /> movement and breakage during shipment. <br /> 10. Ice used to cool samples will be double sealed in two zip lock plastic bags and placed on top and <br /> around the samples to chill them to the correct temperature. <br /> 11. Each ice chest will be securely taped shut with fiberglass strapping tape, and custody seals will <br /> be affixed to the front, right and back of each cooler. <br /> `1 Project No.: 185704833.5.3&5.4 7.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.