Laserfiche WebLink
Potentially Less Than Less Than Analyzed <br /> Si nificant Significant with Si nificant No In The <br /> 9 Mitigation 9 <br /> Impact Incorporated Impact Impact Prior EIR <br /> X. HYDROLOGY AND WATER QUALITY. <br /> Would the project: <br /> a) Violate any water quality standards or waste discharge <br /> requirements or otherwise substantially degrade surface or ❑ ❑ ❑ ® ❑ <br /> ground water quality? <br /> b) Substantially decrease groundwater supplies or interfere <br /> substantially with groundwater recharge such that the <br /> project may impede sustainable groundwater ❑ ❑ ❑ ® ❑ <br /> management of the basin? <br /> c) Substantially alter the existing drainage pattern of the site <br /> or area, including through the alteration of the course of a <br /> stream or river or through the addition of impervious ❑ ❑ ❑ ® ❑ <br /> surfaces, in a manner which would: <br /> i) result in substantial erosion or siltation on-or off-site, ❑ ❑ ❑ ® ❑ <br /> ii) substantially increase the rate or amount of surface <br /> runoff in a manner which would result in flooding on- ❑ ❑ ❑ ® ❑ <br /> or off-site, <br /> iii) create or contribute runoff water which would exceed <br /> the capacity of existing or planned stormwater <br /> drainage systems or provide substantial additional ❑ ❑ ❑ ® ❑ <br /> sources of polluted runoff,or <br /> iv) impede or redirect flood flows? ❑ ❑ ❑ ❑ ❑ <br /> d) In flood hazard, tsunami, or seiche zones, risk release of <br /> pollutants due to project inundation? ❑ ❑ ® ❑ ❑ <br /> e) Conflict with or obstruct implementation of a water quality <br /> control plan or sustainable groundwater management ❑ ❑ ® ❑ ❑ <br /> plan? <br /> Impact Discussion: <br /> a-e) This project has two components.The first is a General Plan designation change from IFF(Truck Terminal)to A/G <br /> (General Agriculture).The second is a Conditional Use Permit Application for an agricultural processing facility(Use <br /> Type: Industry-Agricultural)to include the construction of a 96,959 square foot two-story building. The majority of <br /> the project site is located in the Flood Zone X, 0.2 percent annual chance of flood designations,while a small area <br /> is in the Flood Zone X. A referral has been sent to the Department of Public Works, Flood Control Division for <br /> comments. If approved,any new developments will have to comply with Development Title Section 9-703 regarding <br /> flood hazards. <br /> In regard to process water discharge,the Central Valley Regional Water Quality Control Board(CVRWQCB)Waste <br /> Discharge Requirements Order R5-2021-0063 permits the fruit processing plant on the adjacent parcel to the west <br /> (APN:049-120-65)to discharge process wastewater onto project parcel(APN:049-120-04).The proposed project <br /> will also utilize this process wastewater discharge area. This CVRWQCB Order will remain in effect once the <br /> agricultural processing project is established, and the proposed project includes an 8-acre wastewater discharge <br /> pond to accommodate the process wastewater.The CVRWQCB Order states that approximately 7 million gallons <br /> of wastewater will be directed to the wastewater discharge pond annually. No changes to the discharge area or <br /> process water amount are proposed with this application. Any changes to the discharge area and process <br /> wastewater discharged will be subject to the rules and regulations of the CVRWQCB.The discharge area is planted <br /> in alfalfa, and the alfalfa acts as a natural filter for the process water.The applicant states that the discharge water <br /> 15 <br /> Planning Commission Staff Report, PA-2100295 (GP, SA) 18 <br /> Environmental Review <br />