E
<br />dd
<br />I
<br />0
<br />C
<br />1T1
<br />vq re I ewe 4;
<br />M I Arch itect5, Inc.
<br />A R C H I T E C T U R E
<br />P L A N N I N G
<br />MANAGEMENT
<br />D E 5 1 6 N
<br />2221 OLYMPIC, BLVD.,
<br />SUITE 100
<br />WALNUT GREEK, GA
<br />a45q5
<br />c125-287-1174 Tel
<br />X125 -a45-1581 Fax
<br />c125 -878-q875 Gell
<br />muthonagmiarchitect.com
<br />www.miarchitect.com
<br />DATE: 04-0I-21
<br />}
<br />NOTE: CONTRACTOR
<br />DOUBLE-WALL, FIBERGLASS
<br />• 5
<br />SHEET
<br />OF
<br />PRODUCT PIPING VACUUM
<br />SHALL PROVIDE p w
<br />UNDERGROUND 5TORA6E TANK
<br />(TYP)
<br />O�
<br />FITTING, VENT 8 VAPOR
<br />Q O
<br />O FIBER LINER IN TANK z
<br />w Q HOLE, PRIOR TO TANK dl y
<br />FOR DETAIL OF TANK SLAB,{{i
<br />V
<br />r
<br />;
<br />z
<br />PIPING VACUUM FITTING (SIM.)
<br />=i� I >I INSTALLATION, PER �I SEE DTL. 8 ON 5HT. F.4
<br />zz0
<br />T
<br />4w�
<br />z O
<br />LOCAL FIRE
<br />FILL TUBE
<br />EPDXY SEAL PER
<br />Q 1
<br />CODE zl
<br />REQUIREMENTS.
<br />�nzwm
<br />NFPA SPEC
<br />STP
<br />'
<br />zW�v
<br />z
<br />X
<br />Q
<br />����k/�� I
<br />w oZ&V
<br />MAX.
<br />°O o00
<br />3
<br />2"
<br />X
<br />i
<br />o oo�o god
<br />I
<br />o , ooC
<br />tu��
<br />00 o�poo
<br />00
<br />STP
<br />WEATHERPROOF
<br />w
<br />r
<br />r4�
<br />WASHED PEA
<br />TOP OF
<br />FIBERGLASS
<br />OVERLAY
<br />9f'
<br />Vac Sensor
<br />~�
<br />�-
<br />JUNCTION BOXES
<br />W/ CORD GRIP
<br />WIRING ENTRIES
<br />6RAVEL
<br />.,-Rte:=.__
<br />4" FILL TUBE:�I
<br />I 45
<br />❑
<br />BAGKFILL
<br />\ I (3/8" MIN. d
<br />I/2" MAX.)
<br />STRIKER PLATE
<br />Q E t--....
<br />housing 6.2511
<br />--
<br />—
<br />e
<br />Q
<br />Yp
<br />BRINE
<br />I RESERVOIR
<br />I
<br />I I
<br />I
<br />Tension clamp
<br />PUMP TUBE
<br />OSEE
<br />I
<br />XED
<br />~(TY
<br />E
<br />�
<br />NOTE .)
<br />9.525 12" Min.
<br />DOUBLE WALL TANK
<br />�
<br />+1
<br />I
<br />I SLOPE TANK I IN 10
<br />i I DOWN TOWARD5 FILL END
<br />I NOTE:
<br />Support bracket
<br />LU I STRIKER PLATES
<br />> I I I SHALL BE 1/8 INCH
<br />I \ /
<br />I SEE DTL. A SEE DTL. B
<br />RIGHT RIGHT WIDE ON IEA. 5 DE
<br />� / 4
<br />Riser
<br />VAC, SENSOR
<br />FUEL SYSTEM CONTRACTOR SHALL ENSURE THAT
<br />HOUSING ASSEMBLY
<br />VACUUM SENSOR HOSES ARE LONG ENOUGH SO
<br />BRACKETED TO RISER
<br />oa
<br />Sump
<br />THAT WHEN THE VACUUM SENSOR HOUSING IS SEE DETAIL 3 FOR
<br />REMOVED FROM ITS MOUNT INSIDE THE TURBINE VACUUM SENSOR A55EMBLY 100
<br />SUMP IT GAN BE EASILY PLACED OR SET ON THE
<br />0�°08�
<br />z / /, / �//v _ _ _ _ _
<br />\
<br />_
<br />PLATES UNDER EACH
<br />��� ��������i��,�
<br />STRIKER PLATE
<br />Front View
<br />����,,,� ��4
<br />Side View
<br />TANK PAD FOR EASE OF ANNUAL TESTING.
<br />PIPING, VALVES $ 6AU6ES SHALL BE GLEARLY
<br />OPENING (BYRIKER
<br />TANK MANUFACTURER)
<br />����\! >����\!\\ \!\!i
<br />DET 5
<br />LABELED W/ APPROPRIATE SENSOR ZONE.
<br />2'-0"
<br />± 37'-8 3/4"
<br />2'-0"
<br />SEE DTL. 20 SHT. F.I. FOR VACUUM SENSOR ZONES.
<br />MIN.
<br />VERIFY W/ TANK MF6.
<br />MIN.
<br />TANK SEGTION, ❑
<br />"FOR
<br />REFERENCE QNL�r11
<br />VACUUM SENSOR ASSEMBLY
<br />VACUUM SENSOR DETAIL
<br />NONE
<br />NONE
<br />NONE
<br />FOR REMAINDER OF
<br />NOTES, SEE DTL. 5 ON
<br />SEE SHEET ESI FOR
<br />NEG GLA551FIED
<br />WATERTIGHT
<br />54 MANHOLE COVER
<br />qb
<br />51 TURBINE PUMP STP 51PHON GARTRI06E❑
<br />THIS SHT. (SIM)
<br />AREA NOTES
<br />DOUBLE-WALL, FIBERGLASS
<br />86 4" GAP 8 ADAPTER ON AT6
<br />- PLLD EE
<br />p O
<br />--Iw
<br />w W
<br />UNDERGROUND
<br />PROBE MONITORING FITTING
<br />LL Q >I Z Q
<br />>i
<br />z 0-
<br />Q
<br />5TORA6E TANK (TYP.)X=
<br />88 HYDROSTATIC SENSOR FOR
<br />VACUUM HOSE RUN TO f LEVEL OF MONITORED
<br />I �i I
<br />�i >1
<br />DOUBLE-WALL CONTAINMENT SUMP ----------- -
<br />VACUUM SENSOR X (VAPOR T16HT)
<br /><6I
<br />z
<br />I
<br />FOR DETAIL OF TANK SLAB,
<br />�_ TOP OF SECONDARY
<br />zlZ
<br />I
<br />SEE DTL. 8 ON SHT. F.4
<br />CONTAINMENT
<br />I
<br />Q
<br />I
<br />I I
<br />56 2" FULL PORT BALL VALVE
<br />STYROFOAM (A5 NEEDED)
<br />/4° EXPLOSION PROOF
<br />45° ELBOW
<br />z
<br />X ��/j��/j
<br />�,�//�
<br />I
<br />°0000 0000
<br />°oo�OG�°ooR� �o 0o bo 00
<br />gNXL0o°� I a o�80°°0�
<br />/moi i
<br />�`�`
<br />i��
<br />��
<br />o�'g°�Oo�`
<br />�o0°Do°gvo
<br />\\/\
<br />100 VACUUM SENSOR, SEE
<br />JUNCTION BOX
<br />_
<br />p
<br />p
<br />0000�DooO�
<br />��Oo R� I
<br />OooO�opoo
<br />'^�
<br />DTL. I ON THIS SHT.
<br />CONDUIT SEAL -OFF
<br />-Ooh
<br />4" SCHEDULE 40 BLACK R15ER
<br />I - SUMP PENETRATION FITTING (TYP.) 106
<br />WASHED PEA
<br />82 MA6NETIG PROBE
<br />(1) 3/4" CONDUIT TO INTRIN51GALLY
<br />G'� �L
<br />I SAFE GUTTER AT MONITOR
<br />I
<br />/
<br />I 4" FILL TUBE \
<br />TUBE (TYP)
<br />I
<br />I
<br />\
<br />BAGKFILL
<br />I (3//8" MIN. 4
<br />1/2" MAX.)
<br />DOUB
<br />®SUMP, SEE PTL. (b CONTAINMENT
<br />. ONSHT.F.-7 ----
<br />CONTROL PANEL
<br />3/4" /4 CONDUIT, RUN TO
<br />ELECT. PANEL (PUMP POWER)
<br />LL 'vBRINE45
<br />RESERVOIR
<br />I I ❑
<br />I
<br />EXTRACTOR FITTING 42 43 (A5 APPLICABLE)
<br />NI
<br />FLEX CONNECTOR 113
<br />p
<br />�
<br />TANK
<br />I
<br />SEE BOXED
<br />NOTE IN
<br />104 105 SUMP PENETRATION FITTING
<br />\
<br />VACUUM HOSE, RUN TO VACUUM 3" DOUBLE-WALLF.R.P. PRODUCT PIPING 20
<br />5EN50R (LOCATIONS A5 5PECIFIED
<br />IISLOPE
<br />I
<br />`
<br />_
<br />- '--_ I
<br />IN 10' DOWN
<br />TOWARDS FILL END _
<br />I
<br />I I
<br />DTL. 5 (TYP)
<br />IN DTL. 20 ON SHT. F.7) --------
<br />- - - —
<br />4 I SUMP PENETRATION FITTING 104
<br />�>Y
<br />>
<br />I
<br />I I
<br />I I
<br />I
<br />4" DOUBLE-WALL FRP VAPOR
<br />PIPING ® RE6ULAR UNLEADED TANK,
<br />20 21
<br />DOUBLE-WALL 20
<br />F .R.P. VENT PIPING
<br />F.
<br />3" DOUBLE-WALL FRP VAPOR
<br />PIPING ®PREMIUM UNLEADED TANK
<br />I 3" FRP PIPE OPEN AT
<br />1
<br />,
<br />BOTTOM OF DOUBLE-WALL SUMP
<br />TO
<br />0EE�
<br />5TRI UNISTRUT
<br />"Rot
<br />SEE DTL. SA ABOVE (TVP.)
<br />o°O�oOoo°
<br />000��'
<br />/�//�<
<br />TEST PORT, SEE DTL.
<br />b ON SHT. F.� (TVP.)
<br />LIQUID SENSOR 88
<br />O z `%/�`i�`i
<br />/
<br />�j�`�
<br />/....^
<br />`%j`ij�
<br />INTEGRAL STRIKER PLATES UNDER EACH
<br />WATER FLOAT
<br />°
<br />90 ELBOW OR FLEX CONNECTOR 114 3" FRP PIPE d LIQUID SENSOR
<br />OPENING (BY TANK MANUFACTURER), TYP.
<br />SEE DTL. SB, ABOVE (TVP.)
<br />#88 SHALL BE LOCATED AT THE
<br />BOTTOM LOGKIN6 NUT
<br />POINT OF EARLIEST DETECTION SEE DTL. 20 SHT. F.7
<br />OR FLEX CONNECTOR 114 OR 115 (R.U. TANK)
<br />q0° ELBOWSPECIFIC
<br />FOR TANK SPECIFIC
<br />2 -0
<br />- 5L -3 3/4
<br />2 -O
<br />STEEL PLATE ® BOTTOM OF TANK
<br />OF A RELEASE (LE., AT THE
<br />VACUUM ZONES
<br />LOWEST POINT ON THE PRODUCT
<br />PRODUCT FLOAT 82 PIPING SIDE OF THE SUMP
<br />MIN. VERIFY W/ TANK MF6. MIN. 7K
<br />10
<br />TANK SECTION o
<br />"FOR
<br />REFERENCE QNL*1'11
<br />8
<br />TURBINE, VAPOR VENT $ ATG SUMP
<br />DETAIL
<br />NONE
<br />NONE
<br />VAPOR RECOVERY
<br />31 32
<br />MULTI -PORT MANHOLE W/
<br />40
<br />4" TOP SEAL GAP 2q 30
<br />$ ADAPTER
<br />COORDINATE IN THE FIELD W/ THE FUEL SYSTEM IN5PEGTOR
<br />GAP 8 ADAPTER
<br />LIQUID TIGHT FILL BOX
<br />EXACT LOCATIONS REQUIRED TO BE PROVIDED W/ A TEST PORT
<br />COLORED PRODUCT I.D. MARKERS
<br />TOP SEAL GAP
<br />d ADAPTER 2q 30
<br />IS MANHOLE W/ 37GOVER
<br />SECURE LID
<br />D15TANGE BETWEEN THE MANHOLE
<br />d THE TOP OF THE 5UMP
<br />TO VERIFY COMMUNICATION BETWEEN THE VACUUM SOURCE AND
<br />EACH PIPING RUN. ENSURE SUMP TEST PORTS ARE LOCATED AS
<br />REDUCER SHALL BE PER
<br />CLOSE TO THE TOP OF THE SUMP AS POSSIBLE OR PROVIDE A
<br />SHROUD BOOT (TYP)
<br />JUNCTION BOX GAP BY 5EN50R
<br />; ' MANUFAGTURER 5PEGIFIGATION5
<br />HOSE LONG ENOUGH TO ALLOW TESTING WITHOUT THE REMOVAL
<br />DISTANCE BETWEEN THE MANHOLE COVER
<br />MANUF.
<br />CONCRETE TANK SLAB
<br />OF ANY EQUIPMENT FROM THE SUMP OR FUTURE TESTING)
<br />� THE TOP OF THE SUMP REDUCER SHALL p o
<br />-
<br />BE PER MANUFACTURER 5PEGIFIGATION5
<br />DOUBLE-WALL SUMP
<br />LEVEL OF MONITORED
<br />°
<br />68 121 (A5 APPLICABLE)
<br />(VAPOR TIGHT)
<br />_
<br />�
<br />TOP OF SEGONDARY
<br />CONTAINMENT
<br />WATERTIGHT SHROUD PLATFORM
<br />' „' LEVEL OF MONITORED
<br />(VAPOR TIGHT)
<br />\
<br />20 21 SECONDARY
<br />TOP OF SECONDARY
<br />PIPE (TVP)
<br />3/4"
<br />CONDUIT SEAL
<br />00 �oDOO�oC CONTAINMENT
<br />PRIMARY
<br />20 21
<br />WATERTIGHT CONTAINMENT SUMP
<br />REDUCER (FIBERGLASS ON THE OUTSIDE)
<br />CONDUIT, RUN TO ANNULAR
<br />5PAGE MONITOR JUNCTION BOX
<br />-OFF
<br />OC
<br />O STYROFOAM (AS NEEDED)
<br />PIPE (TYP)
<br />STYROFOAM, A5 NEEDED
<br />IO�aOoOO�Cc
<br />SUMP PENETRATION FITTING 106
<br />(1) 3/4" CONDUIT TO
<br />BB HYDR05TAGIG SENSOR FOR
<br />OUBLE-WALL CONTAINMENT SUMP
<br />I
<br />_
<br />INTRIN51GALLY SAFE ----- 4" THREADED PVC,
<br />GUTTER AT MONITOR PIPE W/ GAP
<br />CONTROL PANEL 8
<br />(NOTE: RISER DOES
<br />I
<br />(1) 3/4° CONDUIT TO � NOT HAVE TO BE
<br />PEA GRAVEL (TYP)
<br />2
<br />FILL / VAPOR SUMP
<br />CENTERED IN BOX)
<br />5 6ALL0 BUCKET
<br />1.1
<br />38 O 3q
<br />4" SCHEDULE 40 BLACK
<br />II DOUBLE-WALL F.R.P. CONTAINMENT
<br />SUMP, SEE SEE DTL. 6 SHT. F.?
<br />i
<br />2
<br />NON` 4" NTP FITTING
<br />TANK IS FILLED WITH
<br />DOUBLE-WALL
<br />BRINE AT FACTORY
<br />CONTAINMENT SUMP,
<br />TATIG � 1
<br />SEE DTL. 6 SHT. F.-75EN50R
<br />3" FRP PIPE OPEN AT
<br />TOP OF TANK
<br />TEST PORT, SEE DTL.
<br />I
<br />BOTTOM, ATTACHED TO
<br />STEEL R15ER W/ UN15TRUT
<br />HYDR05TATIG
<br />6 ON SHT. F.7 (TVP.)
<br />LIQUID SENSOR 88
<br />, MONITORING RE5ERVIOR
<br />FILLED BY TANK MFR.
<br />BOTTOM OF DOUBLE-WALL SUMP
<br />BOTTOM OF DOUBLE-WALL SUMP
<br />THE EXACT PLACEMENT OF THE P051TIVE SHUT-OFF VALVE
<br />SHALL BE DETERMINED IN THE FIELD BY THE FUEL
<br />104 R1610 FIBER6LA55
<br />NOTE:
<br />m
<br />GONTRAGTOR AND SHALL BE DETERMINED BY THE DROP
<br />105 PENETRATION FITTING
<br />+,
<br />TUBE OVERFILL PREVENTION DEVICE MANUFACTURER
<br />I. PERPENDICULAR PENETRATIONS OF CONTAINMENT SUMPS
<br />TANK MANWAY
<br />INSTALLATION, OPERATION d MAINTENANCE MANUAL.
<br />SECONDARY TEST/
<br />PREFERRED. I5° MAXIMUM ALLOWABLE PENETRATION ANG
<br />3" FRP PIPE 8 LIQUID SENSOR
<br />VACUUM HOSE PORT,LE. CONNECT 3 -WAY VALVE
<br />2. U5E
<br />3. ALL
<br />5UMP PENETRATION FITTIN65 AT ALL PENETRATIONS OF THE SUMP. #88 SHALL BE LOCATED AT THE FUEL CONTRACTOR SHALL ENSURE ALL EQUIPMENT
<br />JUNCTION BOXES ARE BE PLACED WITHIN 1'-0" POINT OF EARLIEST DETECTION A55EMBLIE5 SHALL BE WATERTIGHT 8 BE INSTALLED
<br />POSITIVE SHUT-OFF
<br />DEVICE INSTALLED AT 45
<br />(A5 APPLICABLE)
<br />TO OF
<br />NOTE:
<br />THE TOP OF SUMP. (CONDUIT PENETRATIONS SHALL BE LOWER
<br />OF A RELEASE (I.E., AT THE AS REQUIRED BY
<br />THE LOCAL JURISDICTION HAVING
<br />q5% OF TANK CAPACITY
<br />THAN JUNCTION BOX TO ACCOMMODATE FUTURE TESTING)
<br />LOWEST POINT ON THE FILL AUTHORITY d
<br />THE EQUIPMENT MANUFACTURERS
<br />INSTALL SUMP ENTRY FITTINC75 SHALL BE INSTALLED PER MANUFACTURERS
<br />R15ER 51DE OF THE SUMP (TYP) RECOMMENDATIONS d INSTALLATION INSTRUCTIONS
<br />4 ALUM. FILL TUBE
<br />RECOMMENDATIONS, ENSURE THAT PENETRATION FITTINGS ARE COMPLETELY SEALED
<br />4. USE RISER SUPPORT BRACKETS (BRACELETS)
<br />TO SUMP WALL, USING MANUFACTURER APPROVED ADHESIVE AND APPLICATION INSTRUGTIONS
<br />20
<br />FILL / VAPOR SUMP
<br />EDETAIL
<br />18
<br />HYPR05TATIC 5FAGE MONITOR
<br />1
<br />FILL UETAIL
<br />1(0
<br />SUMP ENTRY UETAIL
<br />NONE
<br />NONE
<br />NONE
<br />NONE
<br />1T1
<br />vq re I ewe 4;
<br />M I Arch itect5, Inc.
<br />A R C H I T E C T U R E
<br />P L A N N I N G
<br />MANAGEMENT
<br />D E 5 1 6 N
<br />2221 OLYMPIC, BLVD.,
<br />SUITE 100
<br />WALNUT GREEK, GA
<br />a45q5
<br />c125-287-1174 Tel
<br />X125 -a45-1581 Fax
<br />c125 -878-q875 Gell
<br />muthonagmiarchitect.com
<br />www.miarchitect.com
<br />* C-29627 =
<br />6/30/2023
<br />RENEWAL
<br />C� CALF
<br />z-
<br />—v
<br />w
<br />Q
<br />H��
<br />SLUR
<br />Q0.
<br />— IL
<br />-V
<br />WH
<br />CL
<br />v
<br />�RLu
<br />Q0.=
<br />]LU
<br /><
<br />Cp~4
<br />�z-
<br />QUO
<br />0Fy p�
<br />Qz
<br />(3wN
<br />V
<br />M >0., 0
<br />LU LU
<br />~IS)z
<br />�QH
<br />�z�
<br />z0K
<br />O�Q
<br />LU LU
<br />WpN
<br />�D�
<br />0.
<br />�pw
<br />2!ts
<br />0�w0
<br />QOM
<br />LU
<br />jpz
<br />www
<br />0.N
<br />LUzo
<br />zLUw
<br />=�0
<br />�z
<br />z
<br />O
<br />OON
<br />Qd�
<br />uvW
<br />��
<br />Q
<br />ca o,-)
<br />44-1
<br />NNC,
<br />z__zui
<br />-t�=J)�
<br />LU
<br />oo�
<br />- 155UED FOR GON5TRUGTION
<br />01-20-21 ISSUED FOR PLAN GHEGK
<br />ISSUED FOR PLANNING
<br />NO. DATE DE5GRIPTION
<br />Q2 Oq-Il-21 REVISED PER PLAN GEEGK GOM*W5
<br />Q4 08-Oq-22 REVI5ED PER PLAN GEEGK CMtW5
<br />UST SECTIONS �
<br />MISGELLANEOUS DETAILS
<br />PROJECT #: 20-6615
<br />DRAWN: JM CHECKED: MII
<br />SCALE: AS NOTED
<br />DATE: 04-0I-21
<br />}
<br />• 5
<br />SHEET
<br />OF
<br />O�
<br />�
<br />�
<br />J
<br />V
<br />W
<br />z
<br />zz0
<br />4w�
<br />�}fir
<br />�nzwm
<br />�Oz�
<br />zW�v
<br />X
<br />i
<br />tu��
<br />* C-29627 =
<br />6/30/2023
<br />RENEWAL
<br />C� CALF
<br />z-
<br />—v
<br />w
<br />Q
<br />H��
<br />SLUR
<br />Q0.
<br />— IL
<br />-V
<br />WH
<br />CL
<br />v
<br />�RLu
<br />Q0.=
<br />]LU
<br /><
<br />Cp~4
<br />�z-
<br />QUO
<br />0Fy p�
<br />Qz
<br />(3wN
<br />V
<br />M >0., 0
<br />LU LU
<br />~IS)z
<br />�QH
<br />�z�
<br />z0K
<br />O�Q
<br />LU LU
<br />WpN
<br />�D�
<br />0.
<br />�pw
<br />2!ts
<br />0�w0
<br />QOM
<br />LU
<br />jpz
<br />www
<br />0.N
<br />LUzo
<br />zLUw
<br />=�0
<br />�z
<br />z
<br />O
<br />OON
<br />Qd�
<br />uvW
<br />��
<br />Q
<br />ca o,-)
<br />44-1
<br />NNC,
<br />z__zui
<br />-t�=J)�
<br />LU
<br />oo�
<br />- 155UED FOR GON5TRUGTION
<br />01-20-21 ISSUED FOR PLAN GHEGK
<br />ISSUED FOR PLANNING
<br />NO. DATE DE5GRIPTION
<br />Q2 Oq-Il-21 REVISED PER PLAN GEEGK GOM*W5
<br />Q4 08-Oq-22 REVI5ED PER PLAN GEEGK CMtW5
<br />UST SECTIONS �
<br />MISGELLANEOUS DETAILS
<br />PROJECT #: 20-6615
<br />DRAWN: JM CHECKED: MII
<br />SCALE: AS NOTED
<br />DATE: 04-0I-21
<br />• 5
<br />SHEET
<br />OF
<br />
|