Laserfiche WebLink
UPPER RF <br />GU5TOMIZED TO <br />015PENSER <br />4 MODEL t <br />UDG MID -FRAME <br />LINE OF DISPENSER, <br />BOLTED TO SUMP <br />FRAME (TYP) <br />UPPER RAIN LIP, <br />GU5TOMIZED TO EXACT <br />DISPENSER MAKE <br />4 MODEL # (TYP) <br />UPC MID -FRAME (TYP) <br />SLS <br />(Typ •) <br />a <br />4 D Q a <br />HYDR05TATIG <br />5EN50R, INSTALLED <br />88 INSIDE PRIMARY <br />MANOMETER, <br />INSTALL PER MFR. <br />SPECIFICATIONS <br />SEGONDARY WALL <br />NOTE: <br />SUMP SHOULD BE <br />APPROXIMATELY )/4 INCH <br />ABOVE THE TOP EDGE OF <br />THE CONCRETE SLAB TO <br />ALLOW WATER TO DRAIN <br />AWAY FROM THE SUMP, <br />PER MANUF. REOUIREMENT5 <br />SIDE V I E lel <br />DEFLECTOR PLATE, <br />INSTALLED PER MFR. 68 <br />REQUIREMENTS <br />LINE OF DISPENSER, <br />BOLTED TO SUMP <br />FRAME (TYP) <br />CONCRETE SLAB (TYP) <br />TOP OF CONCRETE <br />.VEL OF MONITORED <br />(VAPOR TIGHT) <br />FOP OF SECONDARY <br />CONTAINMENT <br />TTOM OF CONCRETE <br />(GRADE LEVEL) <br />BOTTOM OF <br />SECONDARY CONTAINMENT <br />MINIMMIN"121 <br />ALIGN TOP OF VENT <br />CONTAINMENT SUMP W/ <br />TOP OF CONCRETE <br />LANDSCAPING <br />TOP OF CONCRETE <br />LEVEL OF MONITORED <br />(VAPOR TIGHT) <br />TOP OF SECONDARY <br />CONTAINMENT <br />OTTOM OF CONCRETE <br />(GRADE LEVEL) <br />BOTTOM OF <br />SECONDARY CONTAINMENT <br />TAN< 5U„IP FLAN <br />67 <br />a <br />DOUBLE-WALL <br />TANK SUMP (TYP.) I I <br />HYDROSTATIC 5EN50R <br />INSTALLED IN MONITORING 88 <br />RESERVOIR. INSTALL PER <br />MANUF. 5PEG5. (TYP) <br />CONCRETE <br />SLAB (TYP.) <br />TOP OF CONCRETE <br />LEVEL OF MONITORED <br />A " TIGHT) <br />gDARY <br />I NMENT <br />CRETE <br />LEVEL) <br />:N50R <br />TORIN6 <br />ALL PER 88 <br />YP.) <br />) a II <br />PRIMARY <br />WALL <br />FILL PORT <br />Opening through <br />interior wall <br />TEST PORT (TYP) <br />BOTTOM OF <br />SECONDARY CONTAINMENT <br />SECONDARY WALL (TYP) <br />PRIMARY WALL (TYP) <br />FILL PORT <br />TEST PORT (TYP) <br />ENSURE SUMP TEST PORTS ARE LOCATED <br />AS CLOSE TO THE TOP OF THE SUMP AS <br />POSSIBLE OR PROVIDE A HOSE LONG <br />ENOUGH TO ALLOW TESTING WITHOUT THE <br />REMOVAL OF ANY EQUIPMENT FROM THE <br />SUMP (FOR FUTURE TESTING) <br />BOTTOM OF <br />SECONDARY CONTAINMENT <br />IAL <br />FRONT V I EW FRONT VIEW 5- TAN< COLL,4fR/SUf= CONNECTION C- Si=,4M JOINTS <br />10 DOUBLE4NALL DISPENSER CONTAINMENT SUMS' 68 8 DOUBLE -YELL \/APOR/\/ENT CONTAINMENT SUMS' OUBLE-PNALL TANK SUMP DETAILS <br />NONE NONE NONE <br />DOUBLE-WALL <br />TURBINE SUMP <br />a 54 <br />DOUBLE-WALL <br />VENT PIPING (TYP) <br />ZONE (DIESEL) <br />NOTE: <br />FOR REMAINDER OF NOTES SEE <br />REGULAR UNLEADED TANK. <br />VACUUM SENSOR 100 <br />DOUBLE-WALL <br />PRODUCT PIPING (TYP) <br />ZONE 6 (DIESEL) <br />FILL RISER <br />DOUBLE-WALL <br />FILL SUMP <br />DOUBLE-WALL <br />VENT PIPING (T(P) <br />ZONE 5 <br />DOUBLE-WALL <br />VAPOR PIPING (T(P) <br />\ ZONE 2 <br />mm <br />DOUBLE-WALL <br />TURBINE SUMP <br />G 54 <br />VACUUM SENSOR 10 <br />DOUBLE-WALL <br />PRODUCT PIPING (TYP) <br />ZONE 4 <br />sl 2O1 MONITORING SYSTEM SCHEMATIC 150METRIG <br />DOUBLE-WALL <br />FILL SUMP <br />I I 40 <br />ANNULAR SPACE <br />MONITOR (TYP) qI <br />88 LIQUID 5EN50R (TYP) <br />STP 51PHON GARTRI06E <br />4rORR05TATIC SENSOR <br />SUMP INTERSTICES <br />100 VACUUM 5EN50R (TYP) <br />SEE DTL. 15HT F.5 <br />DOUBLE-WALL <br />VENT PIPING (TYP) <br />zoNE 3 <br />DOUBLE-WALL, <br />FIBERGLASS <br />UNDERGROUND <br />STORAGE TANK (TYP) <br />❑2 <br />- DOUBLE-WALL <br />PRODUCT PIPING (TYP) <br />ZONE 1 <br />IREGULAIR <br />DEFLECTOR PLATE, <br />TAN< <br />SHOWN- <br />2" TELESCOPING GOMPRE55ION <br />UNLEADED <br />TAN< <br />5I1„IILAR <br />REGULAR 8 PREMIUM <br />UNLEADED TANKS <br />INSTALLED PER MFR. 68 <br />2 <br />ATM05PHERIG <br />FITTING (ONE PER VENT LINE) <br />UNDERGROUND, <br />SEE 5HT. F.3) <br />ZONE 3 <br />VENT PIPING <br />PREMIUM TANK- <br />REQUIREMENTS <br />ZONE 4 <br />MANOMETER <br />ZONE 5 <br />VENT PIPING <br />DIESEL TANK- 2 VACUUM 5EN50R KIT <br />ZONE 6 <br />DIESEL PRODUCT PIPING <br />ZONE 7 <br />VENT PIPING <br />ELECTRICAL OFFSET <br />A6C, <br />HYDROSTATIC <br />ATM05PHERIG <br />SENSOR, INSTALLED <br />- <br />MANOMETER <br />IN51DE PRIMARY <br />ALIGN TOP OF VENT <br />88 MANOMETER. <br />CONTAINMENT SUMP IN/ <br />CONCRETE SLAB (TYP) <br />INSTALL PER MFR. <br />TOP OF CONCRETE <br />SPECIFICATIONS <br />CONCRETE SLAB (TYP) <br />I <br />BOTTOM OF <br />12 MIN. P) <br />(TY <br />/ — <br />SLOpF <br />TOP OF CONCRETE <br />SECONDARY CONTAINMENT <br />( yp <br />SLOPE <br />o <br />o <br />SLOPE <br />TOP OF CONCRETE <br />4. <br />LEVEL OF MONITORED <br />SUMP TEST <br />suMP <br />o <br />4 <br />(VAPOR TIGHT) <br />I <br />PORT (TYP.) <br />TOP <br />Q <br />TOP OF SECONDARY <br />p <br />p <br />/X\ <br />CONTAINMENT <br />I <br />�/ I G <br />z <br />LEVEL OF MONITORED <br />I <br />A - TAN< SUfi Ii= SECTION/X\ <br />BOTTOM OF CONCRETE <br />® ® <br />d <br />(VAPOR TIGHT) <br />(GRADE LEVEL) <br />Q <br />- <br />iv <br />TOP OF SECONDARY <br />INSIDE <br />FIELD <br />OUTSIDE <br />CONTAINMENT <br />LAY-UP <br />FIELD <br />p <br /><BOTTOM <br />OF CONCRETE <br />ENSURE SUMP TEST PORTS ARE LOCATED <br />AS CLOSE TO THE TOP OF THE SUMP AS <br />LAY-UP <br />I I <br />I I <br />(GRADE LEVEL) <br />POSSIBLE OR PROVIDE A HOSE LONG <br />PRIMARY <br />WALL <br />FILL PORT <br />Opening through <br />interior wall <br />TEST PORT (TYP) <br />BOTTOM OF <br />SECONDARY CONTAINMENT <br />SECONDARY WALL (TYP) <br />PRIMARY WALL (TYP) <br />FILL PORT <br />TEST PORT (TYP) <br />ENSURE SUMP TEST PORTS ARE LOCATED <br />AS CLOSE TO THE TOP OF THE SUMP AS <br />POSSIBLE OR PROVIDE A HOSE LONG <br />ENOUGH TO ALLOW TESTING WITHOUT THE <br />REMOVAL OF ANY EQUIPMENT FROM THE <br />SUMP (FOR FUTURE TESTING) <br />BOTTOM OF <br />SECONDARY CONTAINMENT <br />IAL <br />FRONT V I EW FRONT VIEW 5- TAN< COLL,4fR/SUf= CONNECTION C- Si=,4M JOINTS <br />10 DOUBLE4NALL DISPENSER CONTAINMENT SUMS' 68 8 DOUBLE -YELL \/APOR/\/ENT CONTAINMENT SUMS' OUBLE-PNALL TANK SUMP DETAILS <br />NONE NONE NONE <br />DOUBLE-WALL <br />TURBINE SUMP <br />a 54 <br />DOUBLE-WALL <br />VENT PIPING (TYP) <br />ZONE (DIESEL) <br />NOTE: <br />FOR REMAINDER OF NOTES SEE <br />REGULAR UNLEADED TANK. <br />VACUUM SENSOR 100 <br />DOUBLE-WALL <br />PRODUCT PIPING (TYP) <br />ZONE 6 (DIESEL) <br />FILL RISER <br />DOUBLE-WALL <br />FILL SUMP <br />DOUBLE-WALL <br />VENT PIPING (T(P) <br />ZONE 5 <br />DOUBLE-WALL <br />VAPOR PIPING (T(P) <br />\ ZONE 2 <br />mm <br />DOUBLE-WALL <br />TURBINE SUMP <br />G 54 <br />VACUUM SENSOR 10 <br />DOUBLE-WALL <br />PRODUCT PIPING (TYP) <br />ZONE 4 <br />sl 2O1 MONITORING SYSTEM SCHEMATIC 150METRIG <br />DOUBLE-WALL <br />FILL SUMP <br />I I 40 <br />ANNULAR SPACE <br />MONITOR (TYP) qI <br />88 LIQUID 5EN50R (TYP) <br />STP 51PHON GARTRI06E <br />4rORR05TATIC SENSOR <br />SUMP INTERSTICES <br />100 VACUUM 5EN50R (TYP) <br />SEE DTL. 15HT F.5 <br />DOUBLE-WALL <br />VENT PIPING (TYP) <br />zoNE 3 <br />DOUBLE-WALL, <br />FIBERGLASS <br />UNDERGROUND <br />STORAGE TANK (TYP) <br />❑2 <br />- DOUBLE-WALL <br />PRODUCT PIPING (TYP) <br />ZONE 1 <br />IREGULAIR <br />UNLEADED <br />TAN< <br />SHOWN- <br />FREMIU„I <br />UNLEADED <br />TAN< <br />5I1„IILAR <br />FILL RISER <br />(TYP) <br />LIQUID 5EN50R 88 <br />(TYP. <br />ANNULAR SPACE <br />MONITOR (TYP) �I <br />DOUBLE-WALL, <br />FIBERGLASS <br />UNDERGROUND <br />STORAGE TANK <br />❑I <br />MONITORING NOTE: <br />ALL SENSORS SHALL BE CONNECTED TO TLS -350 MONITORING CONSOLE THE FOLLOWING <br />MONITORING SYSTEMS SHALL BE PROGRAMMED FOR COMPLETE SYSTEM SHUT -DOWN: <br />-LIQUID SUMP SENSORS <br />- ELEGTRONIG LINE LEAK DETECTOR (PLLD) <br />- LIQUID DETECTION IN PRODUCT PIPING INTERSTITIAL <br />THE FOLLOWING MONITORING SYSTEMS SHALL BE PROGRAMMED FOR A AUDIBLE / VISUAL ALARM: <br />- ALL INTERSTITIAL SENSORS INCLUDING; HYDR05TATIG <br />4 VACUUM - OVERFILL PROBE <br />- LOW/HIGH PRODUCT 5EN50R <br />-VAPOR PRESSURE SENSOR <br />-VAPOR FLOW METER <br />HYDR05TATIG 5EN50R <br />FOR SUMP INTERSTICES 88 <br />(TYP) <br />LIQUID 5EN50R (T(P) 88 <br />DOUBLE-WALL <br />DISPENSER SUMP SEE 68 <br />DTL. 20 5HT. F.6 (T(P) <br />VAPOR FLOW METER, <br />5EE DTL. 8 5HT. F.b (T ) 83 <br />VAPOR PIPING (TYP) <br />DOUBLE-WALL <br />VAPOR <br />PIPING (TYP) <br />DOUBLE-WALL <br />VENT PIPING (TYP.i <br />VACUUM ZONES <br />REGULAR TANK- <br />3 VACUUM SENSOR KIT <br />ZONE 1 <br />8-7 PRODUCT PIPING <br />ZONE 2 <br />VAPOR PIPING FOR <br />REGULAR 8 PREMIUM <br />UNLEADED TANKS <br />(VAPOR LINES ARE <br />2 <br />MANIFOLDED <br />UNDERGROUND, <br />SEE 5HT. F.3) <br />ZONE 3 <br />VENT PIPING <br />PREMIUM TANK- <br />2 VACUUM SENSOR KIT <br />ZONE 4 <br />GI PRODUCT PIPING <br />ZONE 5 <br />VENT PIPING <br />DIESEL TANK- 2 VACUUM 5EN50R KIT <br />ZONE 6 <br />DIESEL PRODUCT PIPING <br />ZONE 7 <br />VENT PIPING <br />HYDR05TATIG 5EN50R <br />FOR SUMP INTER5TIGE5 88 <br />(TYP) <br />LIQUID 5EN50R (TYP)88 <br />DOUBLE-WALL <br />VENT SUMP SEE 121 <br />DTL. 7 5HT. F.6 <br />1►�i�l <br />A r�kiEeaEs <br />M I Arch itect5, Inc. <br />A R G H I T E G T U R E <br />P L A N N I N G <br />MANAGEMENT <br />D E S 1 6 N <br />2221 OLYMPIC, BLVD., <br />SUITE 100 <br />WALNUT GREEK, GA <br />a45a5 <br />c125-287-1174 Tel <br />q25 -a43-1581 Fax <br />q25 -878-x875 GeII <br />muthanagmiarchitect.com <br />www.miarchitect.Com <br />z� <br />-V <br />lfl H Q <br />V=� <br />Lu�� <br />=40 <br />u Lu <br /><� <br />—W� <br />N <br />W <br />H <br />V <br />H <br />Lu n 2 <br />]mow <br />H <br />mz4 <br />z�� <br />QUO <br />z <br />Q1 <br />Lu Lu <br />X00) <br />�>0 <br />x LU LU <br />LUQ <br />tf z w <br />OLuQ <br />WW <br />WOW LuN <br />HWIL <br />W <br />LL X <br />~OW <br />W� <br />0 N <br />Z Z O p�K <br />Lu <br />O t Jpz <br />WWW <br />CL <br />tu UJ <br />W <br />W <br />to � LL <br />W W <br />O � � �o <br />V• 7— w QQ- <br />N N � <br />tu X ooO <br />006 <br />OLu uj <br />CL IL <br />} QQ� <br />■ lto to U <br />Y ^■ _zz_ui <br />SED ARSy--, <br />-�3 <br />C-29627 = <br />6/30/2023 <br />RENEWAL <br />9� DATE <br />OF <br />ISSUED FOR GON5TRUGTION <br />01-20-21 155UED FOR PLAN GHEGK <br />155UED FOR PLANNING <br />NO. DATE DE50RIPTION <br />02 Oq-Il-21 REVISED PER PLAN GIEGK GOMMENT5 <br />04 08-09-22 REVISED PER PLAN GHEGK GOMMENT5 <br />0 <br />0 <br />0 <br />DOUBLE-WALL TANK SUMP, UX 4 VENT <br />R15ER TRANSITION SUMP DETAILS $ <br />MONITORING SYSTEM 5GHEMATIG 150METRIG <br />PROJECT #: 20-66 15 <br />DRAWN: JM CHECKED: MII <br />SCALE: AS NOTED DATE: 04-01-21 <br />f='v 07 <br />SHEET OF <br />