Laserfiche WebLink
15 <br />Handle shovvn <br />n operating <br />position (down) <br />NjMbers in Circle refer to Nin nurnhers <br />Panel (kit ct)niponents) IATAO if7, <br />See dtl. 10 on this sht. <br />ra <br />lop symbol fan panel) <br />Pressure spnmr�— <br />must he vertical 4„".� <br />—4 <br />ILI <br />Longer portion of <br />bulkhead union 7 <br />inside enclosure. <br />01 <br />Place iaroe washers on both <br />_ 1.7 Flanged parous 1 sides of enclosure wall <br />Vent (factory instaI10d') <br />NOT USED � NOT USED � 15D SENSOR ENCLOSURE <br />Table 2. Vapor Velli Stank - Pressure 5entor Irittallatlon Kit (PM 330020.830) <br />Italy Qty. <br />1 1 <br />- <br />-- Description <br />PAI <br />331946-001 <br />Rressure Sel8or. <br />E <br />2 1 <br />Enclosure, NEMA 0- wd0ied <br />TANK HOLD-DOWN STRAP <br />333004-001. <br />3 1 <br />Panel, composite, modified <br />MANUFACTURER <br />3330(75 Gail <br />4 2 <br />Male elhow 169CA•4.4, brass 114" tube to 114" pipe <br />579066-001 <br />5 a <br />Male can6ector 68CA4.4, brass 114" tube to 1/4" pipe <br />51.4100.4 s0� <br />6 1 <br />Plug 59CA-4, brass 1.14'' tube size <br />014100 4.;2 <br />7 1 <br />Bulkhead union 62CABH•4, hrms 114" tube size <br />514100.4 6 <br />8 2 <br />Washer, 0,469 n 1,125 x 6.063", rine <br />5N%4;573 <br />9 1• <br />Tube - couper,1./4" 0D, short 5 bend <br />333006-0C,1 <br />10 1 <br />Tube • copper,1/4" UD x 8" length <br />33301.8 -OC 1 <br />11 1 <br />Sall valve] 3-way,1/4'° <br />576008.649 <br />12 1 <br />Flub, Conduit, liquiatight, 1/2",zinc <br />576414-715 <br />13 3 <br />Conduit clamp, 2", steel - std duty <br />514100 478 <br />14 3 <br />X15 <br />114.20 x 6 :75?1 hex belt - steel <br />026.620.1. <br />3 <br />Washer, flat,114",.zinc <br />514100.374 <br />16; 3 <br />1/420, ilex nut w11"k washer <br />511000.251 <br />11 1 <br />Vent, porous, flanged, 0.17 x 0,42" <br />51416[1.4. <br />18 2 <br />Wire nut <br />57600$-46 <br />1.4 1 <br />Sealing pack <br />514100.304 <br />i <br />20 1 <br />Curd grip - - <br />331.02.01 <br />I <br />21 2 <br />lie wrap <br />514901.-33 <br />. l <br />22 1 <br />shim <br />332063.•00. <br />3 1 <br />ManuM, instalfattan VR Pressure Sensor <br />577013-79.1 <br />24 1 <br />Manual, ISO Setup & Operation <br />577413-800 <br />25 1 <br />r26 <br />Manual, PMC Setup &.006ration <br />577QZ3 8Q;1 <br />1 <br />151) Quick Reference Guide <br />_ <br />577013.84:� <br />27 1 1Warranty <br />card, ISO system <br />577013 861;7 <br />28 1 <br />Manual, 180 Setup � Operation, VST <br />577013-93;7 <br />29 2 <br />Conduit clamp, 3", steel, Std duty <br />514100.48? <br />30 1 <br />L9401. eMgreen <br />333041.061, <br />10 1 I S17 SENSOR FARTS LIST <br />NONE <br />$E <br />Oi <br />I <br />0 <br />d SAME DIMENSI( <br />FOR ALL SUS <br />Is <br />.4 <br />E <br />51 REQUIREMENTS (TYP) <br />�. <br />HOLD-DOWN STRAP, <br />PER HOLD-DOWN STRAP <br />MANUFACTURER <br />REQUIREMENTS (TYP) <br />j DEADMEN HOLD-DOWN, PER <br />DEADMEN MANUFACTURER <br />REQUIREMENTS (TYP.) <br />LO <br />Schedule 40 piping <br />s and pipe fittings <br />(custamersupplied) <br />Wew A -A <br />OX Numbers in oirCle refer to item <br />numbers (Rit oomponents) in <br />-1 -T Table 2, See dtl. 10 on this sht. <br />ten- Pressure se sor <br />enclosure <br />see dtl. <br />3 on this sht. <br />1/4 `° CopperQ <br />tubing from kit 2441 <br />Maximum <br />_,Center pf <br />Suitable pari; <br />Grade <br />15D SENSOR ENCLOSURE INSTALLATION <br />E <br />NON <br />,,u I' -All nr. <br />20 r�.n, FIBEROLASS STORAGE TANK HOLE.-EDOYNN (20,000 GALLON TANK) o <br />NONE <br />RINE FILLED. <br />lbs. <br />GUIDE <br />LUG <br />NON-GORRO51 VE <br />OR COATED STEEL <br />HOLD DOWN STRAP PER <br />TANK MANUFACTURER <br />cIO% MIN. AND q5% MAX. RELATIVE COMPACTION <br />HOLD -POO NN LOG LOCATIONS <br />NONE <br />GUIDE <br />LUG <br />SPEGIFIGATIONS <br />INSTALL TANK HOLD—DOWNS PER TANK MANUEAGTURER 5PEG I E I GATI ON5 <br />3.1 TANK HOLD-DOWNS (Tie -Downs): <br />A. HOLD-DOWN: <br />When specified the hold-down "logs" shall be installed prior to the bed material. <br />B. Caution - Do not place FRP tanks on concrete slabs, timbers, beams, cradles or grout the tanks in <br />wet Gement. The tank, whether tied down or not, must never be left on the bed without a backfill <br />to the top of the tank if there is any chance of water, 12" or more above the tank bottom, in the hole. <br />3.2 TANK HOLD-DOWN INSTALLATION <br />A. GENERAL REQUIREMENTS: <br />Anchor all underground storage tanks with concrete hold-downs ("logs" or "deadmen") when <br />specified by Owner Rep. in the Scope of Work. <br />I. Tank bedding, ballasting and tank hole backfill procedure are described in these specifications. <br />2. The tank anchorage system shown on the drawings i5 designed for a maximum level of ground <br />water equal to the subgrade level. <br />3.3 MATERIALS <br />A. CONCRETE HOLD-DOWNS: Precast, reinforced concrete "logs", size as specified by tank manufacturer, <br />with chamfered edges. Length, as shown on the drawings. Precast material shall have achieved Its <br />ultimate compressive strength of 2500 psi (28 days) prior to installation. <br />NOTE: Precast concrete foundation piles which meet or exceed above specifications are acceptable. <br />B. WIRE ROPE GABLE: Hot -dip galvanized steel wire rope, minimum 1/2" diameter, breaking strength, 20.4K. <br />G. HARDWARE: Gable clamps, cable guides, guards, etc., furnished by the tank manufacturer, shall <br />be hot -dip galvanized steel. <br />D. PROTECTIVE GOATING: Prior to backfilling tanks, apply a generous quantity of "Asphalt <br />Coating" by brush to all exposed steel cables, loops and hardware. <br />3.4 INSTALLATION PROCEDURE: <br />A. Prepare the tank hole to receive the hold-down "logs". Install shoring (or side sloping) ce necessary. <br />B. Pump the water out of the tank hole. Keep water out of the tank hole until tanks have been set, tied <br />down, ballasted and backfilled. <br />G. Attach each cable around the "log" reserving sufficient cable so that both ends of the cable will be <br />kept at the top of the tank hole after the "logs" are set. Lower and position the "logs" in the tank <br />hole keeping both ends of the cables at the top of the hole. Install the 12" minimum thick bedding <br />material in tank hole. Smooth and slope per the tank bedding instructions. <br />D. Proceed with setting the tanks by adding ballast ce necessary to sink and keep down the tanks. Use <br />only enough ballast to hold the tanks down until the backfill is even with the top of the tanks. <br />Caution: Ballast level in tank must never exceed water (or backfill) level in tank hole during installation. <br />E. Install the cable guards, guides, etc., furnished by the tank manufacturer on the designated ribs of <br />the tank. (Note: "Designated Ribs" are marked by arrows on the tank surface.) <br />Caution: Do not place straps or cables between the ribs of the tank. <br />F. Attach each set of cables (a set of cables are those wrapplong around the matching, or opposite "logs") <br />through the guides as shown on the drawing. <br />I. One end of each cable is to be crossed over the top of the tank in the retainer portion of the <br />hold-down strap. Using three cable clamps on each set of cables, clamp both cables together on top <br />of the tank. Prior to tightening the clamps, tension the cables with "come -a -longs" secured outside the <br />the tank hole. Use enough tension to tighten the Gables but not to lift the "logs" or crush the tank. <br />Caution: All sets of cables on a tank must be tightened equally to avoid tank deformation. <br />2. The cable must rest on the top of the hold-down strap between the guides provided. Repeat this <br />process for each set of tie -down cables. <br />3. After all tie -downs are completed, commence the backfill procedures to the top of the tanks. <br />NOTES <br />I. PIGK–UP POINTS FOR LOGS SHALL BE THE OUTER LOOPS. <br />2. VERIFY LOCATION OF TANK HOLD–DOWN STRAPS WITH TANK MANUFACTURER BEFORE FABRIGATION <br />OF HOLD–DOWN LOGS. <br />I' -All n r. I' -Q" n r. 1111 <br />SAME DIMENSIONS <br />/FOR ALL SUMPS <br />:Q <br />Ell <br />TERSTICE IS FACTORY BRINE FILLED. <br />_ TANK WEIGHT : 12,700 lbs. <br />, � P -K, FIBEROLASS STORAGE TANK HOLD -DOM (20,000 GALLON, 10K x 10K 5FLIT) TANK o <br />ONE <br />1►�i�l <br />A r�kiEeaEs <br />M I Architects, Inc. <br />ARCH I T E G T U R E <br />P L A N N I N G <br />MANA6EMENT <br />D E 5 1 6 N <br />2221 OLYMPIC, BLVD., <br />SUITE 100 <br />WALNUT GREEK, GA <br />04505 <br />c125-287-1174 Tel <br />q25 -q43-1581 Fax <br />q25 -878-g875 Cell <br />muthana(9miarchitect.com <br />www.miarchitect.com <br />z� <br />—v <br />111HQ <br />v=� <br />LU <br />� <br />=40 <br />uw� <br />— u- <br />�O� <br />V. <br />Owe <br />H <br />v <br />H <br />Xw= <br />�0 LUQ <br />�z— <br />Z<� <br />QUO <br />O p >Y <br />QZ <br />(3wUwi <br />U <br />LLO <br />LU L LUQ <br />O <br />Z9K 00D <br />OWQ <br />w w <br />Wp <br />N <br />~u- X <br />Ow <br />�w� <br />ptLU0 <br />Zuj <br />Op�� <br />O t TQz <br />u- <br />tu <br />vzr\ <br />z�w <br />Z ua m p_U �O <br />..nn �z <br />VI ZY <br />00-1 <br />tu x OON <br />Z uv� <br />O if F - <br />O <br />O�Lu Lu <br />��n Uhl Q <br />oo-1 <br />1 Q) <br />X z z Iii <br />W1 <<� <br />SED ARS'' <br />ZSMAI4 611 _ <br />C-29627 = <br />6/30/2023 <br />RENEWAL <br />9� DATE <br />OF/Cp� <br />- ISSUED FOR GONSTRUGTION <br />01-20-21 I550ED FOR PLAN GHEGK <br />- ISSUED FOR PLANNING <br />NO. DATE DESCRIPTION <br />0 <br />0 <br />0 <br />0 <br />0 <br />TANK HOLD-DOWN INSTRUGTIONS <br />$ TANK HOLD-DOWN DRAWIN65 <br />PROJECT #: 20-6615 <br />DRAWN: JM CHECKED: MII <br />SCALE: AS NOTED DATE: 04-0I-21 <br />SHEET <br />F.8 <br />OF <br />NON-GORRO51 VE <br />E <br />OR COATED STEEL <br />TANK HOLD-DOWN STRAP <br />LOCATIONS, PER TANK <br />MANUFACTURER <br />51 REQUIREMENTS (TYP) <br />�. <br />HOLD-DOWN STRAP, <br />PER HOLD-DOWN STRAP <br />MANUFACTURER <br />REQUIREMENTS (TYP) <br />j DEADMEN HOLD-DOWN, PER <br />DEADMEN MANUFACTURER <br />REQUIREMENTS (TYP.) <br />LO <br />Schedule 40 piping <br />s and pipe fittings <br />(custamersupplied) <br />Wew A -A <br />OX Numbers in oirCle refer to item <br />numbers (Rit oomponents) in <br />-1 -T Table 2, See dtl. 10 on this sht. <br />ten- Pressure se sor <br />enclosure <br />see dtl. <br />3 on this sht. <br />1/4 `° CopperQ <br />tubing from kit 2441 <br />Maximum <br />_,Center pf <br />Suitable pari; <br />Grade <br />15D SENSOR ENCLOSURE INSTALLATION <br />E <br />NON <br />,,u I' -All nr. <br />20 r�.n, FIBEROLASS STORAGE TANK HOLE.-EDOYNN (20,000 GALLON TANK) o <br />NONE <br />RINE FILLED. <br />lbs. <br />GUIDE <br />LUG <br />NON-GORRO51 VE <br />OR COATED STEEL <br />HOLD DOWN STRAP PER <br />TANK MANUFACTURER <br />cIO% MIN. AND q5% MAX. RELATIVE COMPACTION <br />HOLD -POO NN LOG LOCATIONS <br />NONE <br />GUIDE <br />LUG <br />SPEGIFIGATIONS <br />INSTALL TANK HOLD—DOWNS PER TANK MANUEAGTURER 5PEG I E I GATI ON5 <br />3.1 TANK HOLD-DOWNS (Tie -Downs): <br />A. HOLD-DOWN: <br />When specified the hold-down "logs" shall be installed prior to the bed material. <br />B. Caution - Do not place FRP tanks on concrete slabs, timbers, beams, cradles or grout the tanks in <br />wet Gement. The tank, whether tied down or not, must never be left on the bed without a backfill <br />to the top of the tank if there is any chance of water, 12" or more above the tank bottom, in the hole. <br />3.2 TANK HOLD-DOWN INSTALLATION <br />A. GENERAL REQUIREMENTS: <br />Anchor all underground storage tanks with concrete hold-downs ("logs" or "deadmen") when <br />specified by Owner Rep. in the Scope of Work. <br />I. Tank bedding, ballasting and tank hole backfill procedure are described in these specifications. <br />2. The tank anchorage system shown on the drawings i5 designed for a maximum level of ground <br />water equal to the subgrade level. <br />3.3 MATERIALS <br />A. CONCRETE HOLD-DOWNS: Precast, reinforced concrete "logs", size as specified by tank manufacturer, <br />with chamfered edges. Length, as shown on the drawings. Precast material shall have achieved Its <br />ultimate compressive strength of 2500 psi (28 days) prior to installation. <br />NOTE: Precast concrete foundation piles which meet or exceed above specifications are acceptable. <br />B. WIRE ROPE GABLE: Hot -dip galvanized steel wire rope, minimum 1/2" diameter, breaking strength, 20.4K. <br />G. HARDWARE: Gable clamps, cable guides, guards, etc., furnished by the tank manufacturer, shall <br />be hot -dip galvanized steel. <br />D. PROTECTIVE GOATING: Prior to backfilling tanks, apply a generous quantity of "Asphalt <br />Coating" by brush to all exposed steel cables, loops and hardware. <br />3.4 INSTALLATION PROCEDURE: <br />A. Prepare the tank hole to receive the hold-down "logs". Install shoring (or side sloping) ce necessary. <br />B. Pump the water out of the tank hole. Keep water out of the tank hole until tanks have been set, tied <br />down, ballasted and backfilled. <br />G. Attach each cable around the "log" reserving sufficient cable so that both ends of the cable will be <br />kept at the top of the tank hole after the "logs" are set. Lower and position the "logs" in the tank <br />hole keeping both ends of the cables at the top of the hole. Install the 12" minimum thick bedding <br />material in tank hole. Smooth and slope per the tank bedding instructions. <br />D. Proceed with setting the tanks by adding ballast ce necessary to sink and keep down the tanks. Use <br />only enough ballast to hold the tanks down until the backfill is even with the top of the tanks. <br />Caution: Ballast level in tank must never exceed water (or backfill) level in tank hole during installation. <br />E. Install the cable guards, guides, etc., furnished by the tank manufacturer on the designated ribs of <br />the tank. (Note: "Designated Ribs" are marked by arrows on the tank surface.) <br />Caution: Do not place straps or cables between the ribs of the tank. <br />F. Attach each set of cables (a set of cables are those wrapplong around the matching, or opposite "logs") <br />through the guides as shown on the drawing. <br />I. One end of each cable is to be crossed over the top of the tank in the retainer portion of the <br />hold-down strap. Using three cable clamps on each set of cables, clamp both cables together on top <br />of the tank. Prior to tightening the clamps, tension the cables with "come -a -longs" secured outside the <br />the tank hole. Use enough tension to tighten the Gables but not to lift the "logs" or crush the tank. <br />Caution: All sets of cables on a tank must be tightened equally to avoid tank deformation. <br />2. The cable must rest on the top of the hold-down strap between the guides provided. Repeat this <br />process for each set of tie -down cables. <br />3. After all tie -downs are completed, commence the backfill procedures to the top of the tanks. <br />NOTES <br />I. PIGK–UP POINTS FOR LOGS SHALL BE THE OUTER LOOPS. <br />2. VERIFY LOCATION OF TANK HOLD–DOWN STRAPS WITH TANK MANUFACTURER BEFORE FABRIGATION <br />OF HOLD–DOWN LOGS. <br />I' -All n r. I' -Q" n r. 1111 <br />SAME DIMENSIONS <br />/FOR ALL SUMPS <br />:Q <br />Ell <br />TERSTICE IS FACTORY BRINE FILLED. <br />_ TANK WEIGHT : 12,700 lbs. <br />, � P -K, FIBEROLASS STORAGE TANK HOLD -DOM (20,000 GALLON, 10K x 10K 5FLIT) TANK o <br />ONE <br />1►�i�l <br />A r�kiEeaEs <br />M I Architects, Inc. <br />ARCH I T E G T U R E <br />P L A N N I N G <br />MANA6EMENT <br />D E 5 1 6 N <br />2221 OLYMPIC, BLVD., <br />SUITE 100 <br />WALNUT GREEK, GA <br />04505 <br />c125-287-1174 Tel <br />q25 -q43-1581 Fax <br />q25 -878-g875 Cell <br />muthana(9miarchitect.com <br />www.miarchitect.com <br />z� <br />—v <br />111HQ <br />v=� <br />LU <br />� <br />=40 <br />uw� <br />— u- <br />�O� <br />V. <br />Owe <br />H <br />v <br />H <br />Xw= <br />�0 LUQ <br />�z— <br />Z<� <br />QUO <br />O p >Y <br />QZ <br />(3wUwi <br />U <br />LLO <br />LU L LUQ <br />O <br />Z9K 00D <br />OWQ <br />w w <br />Wp <br />N <br />~u- X <br />Ow <br />�w� <br />ptLU0 <br />Zuj <br />Op�� <br />O t TQz <br />u- <br />tu <br />vzr\ <br />z�w <br />Z ua m p_U �O <br />..nn �z <br />VI ZY <br />00-1 <br />tu x OON <br />Z uv� <br />O if F - <br />O <br />O�Lu Lu <br />��n Uhl Q <br />oo-1 <br />1 Q) <br />X z z Iii <br />W1 <<� <br />SED ARS'' <br />ZSMAI4 611 _ <br />C-29627 = <br />6/30/2023 <br />RENEWAL <br />9� DATE <br />OF/Cp� <br />- ISSUED FOR GONSTRUGTION <br />01-20-21 I550ED FOR PLAN GHEGK <br />- ISSUED FOR PLANNING <br />NO. DATE DESCRIPTION <br />0 <br />0 <br />0 <br />0 <br />0 <br />TANK HOLD-DOWN INSTRUGTIONS <br />$ TANK HOLD-DOWN DRAWIN65 <br />PROJECT #: 20-6615 <br />DRAWN: JM CHECKED: MII <br />SCALE: AS NOTED DATE: 04-0I-21 <br />SHEET <br />F.8 <br />OF <br />