15
<br />Handle shovvn
<br />n operating
<br />position (down)
<br />NjMbers in Circle refer to Nin nurnhers
<br />Panel (kit ct)niponents) IATAO if7,
<br />See dtl. 10 on this sht.
<br />ra
<br />lop symbol fan panel)
<br />Pressure spnmr�—
<br />must he vertical 4„".�
<br />—4
<br />ILI
<br />Longer portion of
<br />bulkhead union 7
<br />inside enclosure.
<br />01
<br />Place iaroe washers on both
<br />_ 1.7 Flanged parous 1 sides of enclosure wall
<br />Vent (factory instaI10d')
<br />NOT USED � NOT USED � 15D SENSOR ENCLOSURE
<br />Table 2. Vapor Velli Stank - Pressure 5entor Irittallatlon Kit (PM 330020.830)
<br />Italy Qty.
<br />1 1
<br />-
<br />-- Description
<br />PAI
<br />331946-001
<br />Rressure Sel8or.
<br />E
<br />2 1
<br />Enclosure, NEMA 0- wd0ied
<br />TANK HOLD-DOWN STRAP
<br />333004-001.
<br />3 1
<br />Panel, composite, modified
<br />MANUFACTURER
<br />3330(75 Gail
<br />4 2
<br />Male elhow 169CA•4.4, brass 114" tube to 114" pipe
<br />579066-001
<br />5 a
<br />Male can6ector 68CA4.4, brass 114" tube to 1/4" pipe
<br />51.4100.4 s0�
<br />6 1
<br />Plug 59CA-4, brass 1.14'' tube size
<br />014100 4.;2
<br />7 1
<br />Bulkhead union 62CABH•4, hrms 114" tube size
<br />514100.4 6
<br />8 2
<br />Washer, 0,469 n 1,125 x 6.063", rine
<br />5N%4;573
<br />9 1•
<br />Tube - couper,1./4" 0D, short 5 bend
<br />333006-0C,1
<br />10 1
<br />Tube • copper,1/4" UD x 8" length
<br />33301.8 -OC 1
<br />11 1
<br />Sall valve] 3-way,1/4'°
<br />576008.649
<br />12 1
<br />Flub, Conduit, liquiatight, 1/2",zinc
<br />576414-715
<br />13 3
<br />Conduit clamp, 2", steel - std duty
<br />514100 478
<br />14 3
<br />X15
<br />114.20 x 6 :75?1 hex belt - steel
<br />026.620.1.
<br />3
<br />Washer, flat,114",.zinc
<br />514100.374
<br />16; 3
<br />1/420, ilex nut w11"k washer
<br />511000.251
<br />11 1
<br />Vent, porous, flanged, 0.17 x 0,42"
<br />51416[1.4.
<br />18 2
<br />Wire nut
<br />57600$-46
<br />1.4 1
<br />Sealing pack
<br />514100.304
<br />i
<br />20 1
<br />Curd grip - -
<br />331.02.01
<br />I
<br />21 2
<br />lie wrap
<br />514901.-33
<br />. l
<br />22 1
<br />shim
<br />332063.•00.
<br />3 1
<br />ManuM, instalfattan VR Pressure Sensor
<br />577013-79.1
<br />24 1
<br />Manual, ISO Setup & Operation
<br />577413-800
<br />25 1
<br />r26
<br />Manual, PMC Setup &.006ration
<br />577QZ3 8Q;1
<br />1
<br />151) Quick Reference Guide
<br />_
<br />577013.84:�
<br />27 1 1Warranty
<br />card, ISO system
<br />577013 861;7
<br />28 1
<br />Manual, 180 Setup � Operation, VST
<br />577013-93;7
<br />29 2
<br />Conduit clamp, 3", steel, Std duty
<br />514100.48?
<br />30 1
<br />L9401. eMgreen
<br />333041.061,
<br />10 1 I S17 SENSOR FARTS LIST
<br />NONE
<br />$E
<br />Oi
<br />I
<br />0
<br />d SAME DIMENSI(
<br />FOR ALL SUS
<br />Is
<br />.4
<br />E
<br />51 REQUIREMENTS (TYP)
<br />�.
<br />HOLD-DOWN STRAP,
<br />PER HOLD-DOWN STRAP
<br />MANUFACTURER
<br />REQUIREMENTS (TYP)
<br />j DEADMEN HOLD-DOWN, PER
<br />DEADMEN MANUFACTURER
<br />REQUIREMENTS (TYP.)
<br />LO
<br />Schedule 40 piping
<br />s and pipe fittings
<br />(custamersupplied)
<br />Wew A -A
<br />OX Numbers in oirCle refer to item
<br />numbers (Rit oomponents) in
<br />-1 -T Table 2, See dtl. 10 on this sht.
<br />ten- Pressure se sor
<br />enclosure
<br />see dtl.
<br />3 on this sht.
<br />1/4 `° CopperQ
<br />tubing from kit 2441
<br />Maximum
<br />_,Center pf
<br />Suitable pari;
<br />Grade
<br />15D SENSOR ENCLOSURE INSTALLATION
<br />E
<br />NON
<br />,,u I' -All nr.
<br />20 r�.n, FIBEROLASS STORAGE TANK HOLE.-EDOYNN (20,000 GALLON TANK) o
<br />NONE
<br />RINE FILLED.
<br />lbs.
<br />GUIDE
<br />LUG
<br />NON-GORRO51 VE
<br />OR COATED STEEL
<br />HOLD DOWN STRAP PER
<br />TANK MANUFACTURER
<br />cIO% MIN. AND q5% MAX. RELATIVE COMPACTION
<br />HOLD -POO NN LOG LOCATIONS
<br />NONE
<br />GUIDE
<br />LUG
<br />SPEGIFIGATIONS
<br />INSTALL TANK HOLD—DOWNS PER TANK MANUEAGTURER 5PEG I E I GATI ON5
<br />3.1 TANK HOLD-DOWNS (Tie -Downs):
<br />A. HOLD-DOWN:
<br />When specified the hold-down "logs" shall be installed prior to the bed material.
<br />B. Caution - Do not place FRP tanks on concrete slabs, timbers, beams, cradles or grout the tanks in
<br />wet Gement. The tank, whether tied down or not, must never be left on the bed without a backfill
<br />to the top of the tank if there is any chance of water, 12" or more above the tank bottom, in the hole.
<br />3.2 TANK HOLD-DOWN INSTALLATION
<br />A. GENERAL REQUIREMENTS:
<br />Anchor all underground storage tanks with concrete hold-downs ("logs" or "deadmen") when
<br />specified by Owner Rep. in the Scope of Work.
<br />I. Tank bedding, ballasting and tank hole backfill procedure are described in these specifications.
<br />2. The tank anchorage system shown on the drawings i5 designed for a maximum level of ground
<br />water equal to the subgrade level.
<br />3.3 MATERIALS
<br />A. CONCRETE HOLD-DOWNS: Precast, reinforced concrete "logs", size as specified by tank manufacturer,
<br />with chamfered edges. Length, as shown on the drawings. Precast material shall have achieved Its
<br />ultimate compressive strength of 2500 psi (28 days) prior to installation.
<br />NOTE: Precast concrete foundation piles which meet or exceed above specifications are acceptable.
<br />B. WIRE ROPE GABLE: Hot -dip galvanized steel wire rope, minimum 1/2" diameter, breaking strength, 20.4K.
<br />G. HARDWARE: Gable clamps, cable guides, guards, etc., furnished by the tank manufacturer, shall
<br />be hot -dip galvanized steel.
<br />D. PROTECTIVE GOATING: Prior to backfilling tanks, apply a generous quantity of "Asphalt
<br />Coating" by brush to all exposed steel cables, loops and hardware.
<br />3.4 INSTALLATION PROCEDURE:
<br />A. Prepare the tank hole to receive the hold-down "logs". Install shoring (or side sloping) ce necessary.
<br />B. Pump the water out of the tank hole. Keep water out of the tank hole until tanks have been set, tied
<br />down, ballasted and backfilled.
<br />G. Attach each cable around the "log" reserving sufficient cable so that both ends of the cable will be
<br />kept at the top of the tank hole after the "logs" are set. Lower and position the "logs" in the tank
<br />hole keeping both ends of the cables at the top of the hole. Install the 12" minimum thick bedding
<br />material in tank hole. Smooth and slope per the tank bedding instructions.
<br />D. Proceed with setting the tanks by adding ballast ce necessary to sink and keep down the tanks. Use
<br />only enough ballast to hold the tanks down until the backfill is even with the top of the tanks.
<br />Caution: Ballast level in tank must never exceed water (or backfill) level in tank hole during installation.
<br />E. Install the cable guards, guides, etc., furnished by the tank manufacturer on the designated ribs of
<br />the tank. (Note: "Designated Ribs" are marked by arrows on the tank surface.)
<br />Caution: Do not place straps or cables between the ribs of the tank.
<br />F. Attach each set of cables (a set of cables are those wrapplong around the matching, or opposite "logs")
<br />through the guides as shown on the drawing.
<br />I. One end of each cable is to be crossed over the top of the tank in the retainer portion of the
<br />hold-down strap. Using three cable clamps on each set of cables, clamp both cables together on top
<br />of the tank. Prior to tightening the clamps, tension the cables with "come -a -longs" secured outside the
<br />the tank hole. Use enough tension to tighten the Gables but not to lift the "logs" or crush the tank.
<br />Caution: All sets of cables on a tank must be tightened equally to avoid tank deformation.
<br />2. The cable must rest on the top of the hold-down strap between the guides provided. Repeat this
<br />process for each set of tie -down cables.
<br />3. After all tie -downs are completed, commence the backfill procedures to the top of the tanks.
<br />NOTES
<br />I. PIGK–UP POINTS FOR LOGS SHALL BE THE OUTER LOOPS.
<br />2. VERIFY LOCATION OF TANK HOLD–DOWN STRAPS WITH TANK MANUFACTURER BEFORE FABRIGATION
<br />OF HOLD–DOWN LOGS.
<br />I' -All n r. I' -Q" n r. 1111
<br />SAME DIMENSIONS
<br />/FOR ALL SUMPS
<br />:Q
<br />Ell
<br />TERSTICE IS FACTORY BRINE FILLED.
<br />_ TANK WEIGHT : 12,700 lbs.
<br />, � P -K, FIBEROLASS STORAGE TANK HOLD -DOM (20,000 GALLON, 10K x 10K 5FLIT) TANK o
<br />ONE
<br />1►�i�l
<br />A r�kiEeaEs
<br />M I Architects, Inc.
<br />ARCH I T E G T U R E
<br />P L A N N I N G
<br />MANA6EMENT
<br />D E 5 1 6 N
<br />2221 OLYMPIC, BLVD.,
<br />SUITE 100
<br />WALNUT GREEK, GA
<br />04505
<br />c125-287-1174 Tel
<br />q25 -q43-1581 Fax
<br />q25 -878-g875 Cell
<br />muthana(9miarchitect.com
<br />www.miarchitect.com
<br />z�
<br />—v
<br />111HQ
<br />v=�
<br />LU
<br />�
<br />=40
<br />uw�
<br />— u-
<br />�O�
<br />V.
<br />Owe
<br />H
<br />v
<br />H
<br />Xw=
<br />�0 LUQ
<br />�z—
<br />Z<�
<br />QUO
<br />O p >Y
<br />QZ
<br />(3wUwi
<br />U
<br />LLO
<br />LU L LUQ
<br />O
<br />Z9K 00D
<br />OWQ
<br />w w
<br />Wp
<br />N
<br />~u- X
<br />Ow
<br />�w�
<br />ptLU0
<br />Zuj
<br />Op��
<br />O t TQz
<br />u-
<br />tu
<br />vzr\
<br />z�w
<br />Z ua m p_U �O
<br />..nn �z
<br />VI ZY
<br />00-1
<br />tu x OON
<br />Z uv�
<br />O if F -
<br />O
<br />O�Lu Lu
<br />��n Uhl Q
<br />oo-1
<br />1 Q)
<br />X z z Iii
<br />W1 <<�
<br />SED ARS''
<br />ZSMAI4 611 _
<br />C-29627 =
<br />6/30/2023
<br />RENEWAL
<br />9� DATE
<br />OF/Cp�
<br />- ISSUED FOR GONSTRUGTION
<br />01-20-21 I550ED FOR PLAN GHEGK
<br />- ISSUED FOR PLANNING
<br />NO. DATE DESCRIPTION
<br />0
<br />0
<br />0
<br />0
<br />0
<br />TANK HOLD-DOWN INSTRUGTIONS
<br />$ TANK HOLD-DOWN DRAWIN65
<br />PROJECT #: 20-6615
<br />DRAWN: JM CHECKED: MII
<br />SCALE: AS NOTED DATE: 04-0I-21
<br />SHEET
<br />F.8
<br />OF
<br />NON-GORRO51 VE
<br />E
<br />OR COATED STEEL
<br />TANK HOLD-DOWN STRAP
<br />LOCATIONS, PER TANK
<br />MANUFACTURER
<br />51 REQUIREMENTS (TYP)
<br />�.
<br />HOLD-DOWN STRAP,
<br />PER HOLD-DOWN STRAP
<br />MANUFACTURER
<br />REQUIREMENTS (TYP)
<br />j DEADMEN HOLD-DOWN, PER
<br />DEADMEN MANUFACTURER
<br />REQUIREMENTS (TYP.)
<br />LO
<br />Schedule 40 piping
<br />s and pipe fittings
<br />(custamersupplied)
<br />Wew A -A
<br />OX Numbers in oirCle refer to item
<br />numbers (Rit oomponents) in
<br />-1 -T Table 2, See dtl. 10 on this sht.
<br />ten- Pressure se sor
<br />enclosure
<br />see dtl.
<br />3 on this sht.
<br />1/4 `° CopperQ
<br />tubing from kit 2441
<br />Maximum
<br />_,Center pf
<br />Suitable pari;
<br />Grade
<br />15D SENSOR ENCLOSURE INSTALLATION
<br />E
<br />NON
<br />,,u I' -All nr.
<br />20 r�.n, FIBEROLASS STORAGE TANK HOLE.-EDOYNN (20,000 GALLON TANK) o
<br />NONE
<br />RINE FILLED.
<br />lbs.
<br />GUIDE
<br />LUG
<br />NON-GORRO51 VE
<br />OR COATED STEEL
<br />HOLD DOWN STRAP PER
<br />TANK MANUFACTURER
<br />cIO% MIN. AND q5% MAX. RELATIVE COMPACTION
<br />HOLD -POO NN LOG LOCATIONS
<br />NONE
<br />GUIDE
<br />LUG
<br />SPEGIFIGATIONS
<br />INSTALL TANK HOLD—DOWNS PER TANK MANUEAGTURER 5PEG I E I GATI ON5
<br />3.1 TANK HOLD-DOWNS (Tie -Downs):
<br />A. HOLD-DOWN:
<br />When specified the hold-down "logs" shall be installed prior to the bed material.
<br />B. Caution - Do not place FRP tanks on concrete slabs, timbers, beams, cradles or grout the tanks in
<br />wet Gement. The tank, whether tied down or not, must never be left on the bed without a backfill
<br />to the top of the tank if there is any chance of water, 12" or more above the tank bottom, in the hole.
<br />3.2 TANK HOLD-DOWN INSTALLATION
<br />A. GENERAL REQUIREMENTS:
<br />Anchor all underground storage tanks with concrete hold-downs ("logs" or "deadmen") when
<br />specified by Owner Rep. in the Scope of Work.
<br />I. Tank bedding, ballasting and tank hole backfill procedure are described in these specifications.
<br />2. The tank anchorage system shown on the drawings i5 designed for a maximum level of ground
<br />water equal to the subgrade level.
<br />3.3 MATERIALS
<br />A. CONCRETE HOLD-DOWNS: Precast, reinforced concrete "logs", size as specified by tank manufacturer,
<br />with chamfered edges. Length, as shown on the drawings. Precast material shall have achieved Its
<br />ultimate compressive strength of 2500 psi (28 days) prior to installation.
<br />NOTE: Precast concrete foundation piles which meet or exceed above specifications are acceptable.
<br />B. WIRE ROPE GABLE: Hot -dip galvanized steel wire rope, minimum 1/2" diameter, breaking strength, 20.4K.
<br />G. HARDWARE: Gable clamps, cable guides, guards, etc., furnished by the tank manufacturer, shall
<br />be hot -dip galvanized steel.
<br />D. PROTECTIVE GOATING: Prior to backfilling tanks, apply a generous quantity of "Asphalt
<br />Coating" by brush to all exposed steel cables, loops and hardware.
<br />3.4 INSTALLATION PROCEDURE:
<br />A. Prepare the tank hole to receive the hold-down "logs". Install shoring (or side sloping) ce necessary.
<br />B. Pump the water out of the tank hole. Keep water out of the tank hole until tanks have been set, tied
<br />down, ballasted and backfilled.
<br />G. Attach each cable around the "log" reserving sufficient cable so that both ends of the cable will be
<br />kept at the top of the tank hole after the "logs" are set. Lower and position the "logs" in the tank
<br />hole keeping both ends of the cables at the top of the hole. Install the 12" minimum thick bedding
<br />material in tank hole. Smooth and slope per the tank bedding instructions.
<br />D. Proceed with setting the tanks by adding ballast ce necessary to sink and keep down the tanks. Use
<br />only enough ballast to hold the tanks down until the backfill is even with the top of the tanks.
<br />Caution: Ballast level in tank must never exceed water (or backfill) level in tank hole during installation.
<br />E. Install the cable guards, guides, etc., furnished by the tank manufacturer on the designated ribs of
<br />the tank. (Note: "Designated Ribs" are marked by arrows on the tank surface.)
<br />Caution: Do not place straps or cables between the ribs of the tank.
<br />F. Attach each set of cables (a set of cables are those wrapplong around the matching, or opposite "logs")
<br />through the guides as shown on the drawing.
<br />I. One end of each cable is to be crossed over the top of the tank in the retainer portion of the
<br />hold-down strap. Using three cable clamps on each set of cables, clamp both cables together on top
<br />of the tank. Prior to tightening the clamps, tension the cables with "come -a -longs" secured outside the
<br />the tank hole. Use enough tension to tighten the Gables but not to lift the "logs" or crush the tank.
<br />Caution: All sets of cables on a tank must be tightened equally to avoid tank deformation.
<br />2. The cable must rest on the top of the hold-down strap between the guides provided. Repeat this
<br />process for each set of tie -down cables.
<br />3. After all tie -downs are completed, commence the backfill procedures to the top of the tanks.
<br />NOTES
<br />I. PIGK–UP POINTS FOR LOGS SHALL BE THE OUTER LOOPS.
<br />2. VERIFY LOCATION OF TANK HOLD–DOWN STRAPS WITH TANK MANUFACTURER BEFORE FABRIGATION
<br />OF HOLD–DOWN LOGS.
<br />I' -All n r. I' -Q" n r. 1111
<br />SAME DIMENSIONS
<br />/FOR ALL SUMPS
<br />:Q
<br />Ell
<br />TERSTICE IS FACTORY BRINE FILLED.
<br />_ TANK WEIGHT : 12,700 lbs.
<br />, � P -K, FIBEROLASS STORAGE TANK HOLD -DOM (20,000 GALLON, 10K x 10K 5FLIT) TANK o
<br />ONE
<br />1►�i�l
<br />A r�kiEeaEs
<br />M I Architects, Inc.
<br />ARCH I T E G T U R E
<br />P L A N N I N G
<br />MANA6EMENT
<br />D E 5 1 6 N
<br />2221 OLYMPIC, BLVD.,
<br />SUITE 100
<br />WALNUT GREEK, GA
<br />04505
<br />c125-287-1174 Tel
<br />q25 -q43-1581 Fax
<br />q25 -878-g875 Cell
<br />muthana(9miarchitect.com
<br />www.miarchitect.com
<br />z�
<br />—v
<br />111HQ
<br />v=�
<br />LU
<br />�
<br />=40
<br />uw�
<br />— u-
<br />�O�
<br />V.
<br />Owe
<br />H
<br />v
<br />H
<br />Xw=
<br />�0 LUQ
<br />�z—
<br />Z<�
<br />QUO
<br />O p >Y
<br />QZ
<br />(3wUwi
<br />U
<br />LLO
<br />LU L LUQ
<br />O
<br />Z9K 00D
<br />OWQ
<br />w w
<br />Wp
<br />N
<br />~u- X
<br />Ow
<br />�w�
<br />ptLU0
<br />Zuj
<br />Op��
<br />O t TQz
<br />u-
<br />tu
<br />vzr\
<br />z�w
<br />Z ua m p_U �O
<br />..nn �z
<br />VI ZY
<br />00-1
<br />tu x OON
<br />Z uv�
<br />O if F -
<br />O
<br />O�Lu Lu
<br />��n Uhl Q
<br />oo-1
<br />1 Q)
<br />X z z Iii
<br />W1 <<�
<br />SED ARS''
<br />ZSMAI4 611 _
<br />C-29627 =
<br />6/30/2023
<br />RENEWAL
<br />9� DATE
<br />OF/Cp�
<br />- ISSUED FOR GONSTRUGTION
<br />01-20-21 I550ED FOR PLAN GHEGK
<br />- ISSUED FOR PLANNING
<br />NO. DATE DESCRIPTION
<br />0
<br />0
<br />0
<br />0
<br />0
<br />TANK HOLD-DOWN INSTRUGTIONS
<br />$ TANK HOLD-DOWN DRAWIN65
<br />PROJECT #: 20-6615
<br />DRAWN: JM CHECKED: MII
<br />SCALE: AS NOTED DATE: 04-0I-21
<br />SHEET
<br />F.8
<br />OF
<br />
|