My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
REMOVAL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:37:52 PM
Creation date
12/5/2022 8:30:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2022
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lel " lovative <br /> onstruction <br /> olutionj <br /> 4 . 0 HEALTH AND SAFETY RISK ANALYSIS <br /> 4 . 1 NON -CHEMICAL HAZARD SUMMARY <br /> Field staff must review job - specific work plan and coordinate with project manager to verify that <br /> all up -front logistics are completed prior to starting work including, but not limited to , permitting , <br /> access agreements , and notification to required contacts . A tailgate safety meeting must be <br /> performed and documented at the beginning of each workday . <br /> Mental Risk Assessment ( MRA ) procedures must be used during field activities . Weather <br /> conditions ( heat, cold , rain , and lightning ) must also be considered . An Activity Hazard Analysis <br /> ( AHA) has been completed for the project . In the event site conditions change a blank AHA has <br /> been included for completion in the field . All Hot Work activities must be pre - approved by the <br /> SSO and or HSM . <br /> Table 44 presents a summary assessment of non -chemical hazards . <br /> Table 44 Assessment of Non - Chemical Hazards <br /> Non - Chemical Hazard Yes No <br /> 1 . Electrical - overhead lines ( if heavy equipment is used ) ❑ ❑X <br /> 2 . Underground utilities ❑X ❑ <br /> 3 . Coring Equipment ❑ ❑X <br /> 4 . Drilling Equipment ( Geoprobe '" , Hollow Stem Auger, etc . ) ❑ ❑X <br /> 5 . Heavy Equipment ❑X ❑ <br /> 6 . Machinery ❑ ❑X <br /> 7 . Heat Exposure ❑X ❑ <br /> 8 . Cold Exposure ❑ ❑X <br /> 9 . Confined Spaces ( includes excavations/trenches > 4-feet ) ❑ ❑X <br /> 10 . Explosive Atmosphere ❑X ❑ <br /> 11 . Noise ❑X ❑ <br /> 12 . Ionizing Radiation ❑ <br /> 13 . Non - ionizing Radiation ❑X ❑ <br /> 14 . Fire ❑X ❑ <br /> 15 . Vehicle Traffic ❑ ❑x <br /> 16 . Biological ❑X ❑ <br /> 17 . Excavations/ Holes/ Ditches/Trenches ❑X ❑ <br /> 18 . Steep Grades ❑ ❑X <br /> 19 . Slippery Surfaces © ❑ <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.