My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
REMOVAL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:37:52 PM
Creation date
12/5/2022 8:30:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2022
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nnovative <br /> onstruction <br /> olutions <br /> • Ensure that daily safety briefings are conducted with assistance from the site supervisor <br /> under the direction and oversight of Error ! Reference source not found . SSO . <br /> • Initiate emergency response procedures with immediate communication to the PM . <br /> • Exercise stop -work authority in the event of imminent danger to project personnel . <br /> • Resolve any noncompliance issues with the site supervisor . <br /> • Conduct regular inspections to determine effectiveness of the HASP . <br /> • Maintain the SSO logbook . <br /> • Ensure the adequacy of the respiratory protection program , including proper respirator <br /> use , cleaning, inspection , and storage . <br /> • Maintain copies of documents ( e . g . , training, medical , fit test ) . <br /> Stantec <br /> Stantec SSO may serve a similar role as the ICS SSO as it relates to the Stantec HASP . <br /> 3 . 1 . 4 PROJECT PERSONNEL <br /> Project personnel involved in field activities are responsible for : <br /> • Taking all reasonable precautions to prevent injury to themselves and to fellow <br /> employees . <br /> • Conducting only those tasks that they believe they can do safely . <br /> • Reporting all occurrences and/or unsafe conditions to the SSO or PM . <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.