My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
REMOVAL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:37:52 PM
Creation date
12/5/2022 8:30:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2022
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nnovative <br /> onstruction <br /> olutions <br /> perpetrators cannot see items . At project locations in known high - crime areas The <br /> Superintendent will take special precautions to prevent loss or damage from occurring . <br /> 4 . 2 . 38 HAND TOOLS <br /> Proper selection , training and use of hand tools is critical to preventing bodily injuries . Tools <br /> shall be kept clean and in good working condition . Use of broken or compromised tools is not <br /> permitted and such tool shall be removed from service immediately or red -tagged for repair . <br /> The ICS Superintendent is responsible for providing replacement tools if needed . <br /> 4 . 2 . 39 SENSITIVE SPECIES <br /> Intentionally Left Blank <br /> 4 . 2 .40 ARCHEOLOGICAL RESOURCES <br /> Intentionally Left Blank <br /> 4 . 2 . 41 LOCKOUT- TAGOUT <br /> Procedures will be followed before conducting industrial type work on systems to ensure that <br /> dangerous machines are properly shut off and not able to be started up again prior to the <br /> completion of maintenance or repair work . Pressurized piping containing air, gas, water or other <br /> liquids must be bled off slowly by qualified personnel prior to commencement of work . Proper <br /> verification shall be made with client to ensure safe operations . <br /> 4 . 2 . 42 LIFTING AND RIGGING <br /> All loads being moved shall pe properly secured using properly rated straps, chains, slings and <br /> hardware . Tags and stamps with load ratings for each piece used must be legible and clearly <br /> shown with maximum load capacities . As per OSHA CFR 1926 . 251 Rigging equipment for material <br /> handling shall be inspected prior to use on each shift and as necessary during its use to ensure <br /> that it is safe . Defective rigging will be removed from service . <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.