Laserfiche WebLink
SA N J O A Q U IN Environmental Health Department <br />—COU NTY— <br />,p K. Entrance doors to food preparation area and service openings shall be self-closing. [CRFC <br />Section 114303]. <br />9 V7. Floors shall be constructed of approved materials and shall be impervious, smooth, easily <br />cleanable, and provide employee safety from slipping. The floor/wall juncture shall be coved <br />with a minimum 3/8 inch radius and the floor surface shall extend up the wall at least four <br />inches. (Vinyl rubber top -set base is not acceptable material). Equipment shall be sealed to <br />the floor or raised 6 inches off the floor by means of easily cleanable legs or feet [CRFC <br />Section 114301]. <br />, 8 Mobile food facilities shall have a clear, unobstructed height over the aisle -way portion of the <br />p unit of at least 74 inches from floor to ceiling, and a minimum of 30 inches of unobstructed <br />horizontal aisle space [CRFC Section 114321]. <br />Ov- 9. A second means of exit shall be provided in the side opposite the main exit door, or in the <br />roof, or the rear of the unit, with an unobstructed passage of at least 24 inches by 36 inches. <br />The interior latching mechanism shall be operable by hand without special tools or key. The exit <br />shall be labeled "Safety Exit" in contrasting colors with letters at least one inch high [CRFC <br />Section 114323]. compartments with two integral metal drainboards. The dimensions of each <br />compartment of the warewashing sink shall be at least 12 inches wide, 12 inches long, and 10 <br />inches deep, or large enough to accommodate the cleaning of the largest utensil. Each <br />drainboard shall be at least the size of one of the sink compartments. The drainboards shall be <br />installed with at least one-eighth inch per foot slope toward the sink compartment and fabricated <br />with a minimum of one-half inch lip or rim to prevent the draining liquid from spilling onto the <br />floor [CRFC Section 1143131. <br />The EHD must be kept informed of the construction progress. A final inspection must be <br />performed, operating permit fees paid, and approval to operate granted prior to opening for <br />business. All equipment must be installed and thorough cleaning completed prior to the final <br />inspection. Inspections must be scheduled at least 48 hours in advance. Charges for <br />additional inspections, re -inspections and/or consultations may be assessed at the EHD <br />hourly rate of $ 156 per hour. <br />Any item(s) inadvertently overlooked in the plan check process, which is not in compliance <br />with applicable State laws, and/or city or county ordinance codes, shall be constructed or <br />reconstructed upon request of the EHD. Inferior workmanship, equipment, or materials will not <br />be accepted for the construction or operation of a food facility. Any variance from the <br />requirements outlined in this letter will require written approval from the EHD. Approval of the <br />submitted plans shall become null and void if the work authorized is not commenced within <br />180 days from the date of approval, or the work authorized by such plans is abandoned. In <br />order to renew action on an expired plan approval, the applicant shall submit fees equal to <br />that of a new plan review. A copy of the approved plans shall be available on site at the time <br />of final inspection. <br />2 of <br />