My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
U
>
UNION
>
1717
>
1600 - Food Program
>
PR0548015
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2022 4:53:10 PM
Creation date
12/28/2022 4:52:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0548015
PE
1635
FACILITY_ID
FA0027391
FACILITY_NAME
SOUTHERN SEAFOOD #98840J3
STREET_NUMBER
1717
Direction
S
STREET_NAME
UNION
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
16904012
CURRENT_STATUS
01
SITE_LOCATION
1717 S UNION ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA N of O A Q U I N Environmental Health Department <br />COUNTY— <br />The EHD must be kept informed of the construction progress. A final inspection must be <br />performed, operating permit fees paid, and approval to operate granted prior to opening for <br />business. All equipment must be installed and thorough cleaning completed prior to the final <br />inspection. Inspections must be scheduled at least 48 hours in advance. Charges for additional <br />inspections, re -inspections and/or consultations may be assessed at the EHD hourly rate of $ <br />152 per hour. <br />Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br />applicable State laws, and/or city or county ordinance codes, shall be constructed or <br />reconstructed upon request of the EHD. Inferior workmanship, equipment, or materials will not <br />be accepted for the construction or operation of a food facility. Any variance from the <br />requirements outlined in this letter will require written approval from the EHD. Approval of the <br />submitted plans shall become null and void if the work authorized is not commenced within 180 <br />days from the date of approval, or the work authorized by such plans is abandoned. In order to <br />renew action on an expired plan approval, the applicant shall submit fees equal to that of a new <br />plan review. A copy of the approved plans shall be available on site at the time of final <br />inspection. <br />If you have any questions, please contact Vidal Pedraza, Lead Senior Registered <br />Environmental Health Specialist, at (209) 209-468-0334. <br />Sincerely, <br />1 4 <br />Jeff Carruesco, REHS, RDI <br />Program Coordinator <br />3 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.