Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer El Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID 87 STP 91 STP Diesel STP <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass <br /> Sump Depth (inches) 48" 48" 48" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 25" 23" 23" <br /> (inches) <br /> Test Start Time 9:11 am 9:11 am 12:23 pm <br /> Initial Reading 4.6331 4.6261 4.5975 <br /> Test End Time 9:26 am 9:26 am 12:38 pm <br /> Final Reading 4.6323 4.6250 4.5991 <br /> Change in Reading 0.0008 0.0011 0.0016 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results p Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />